GB
26
English
Use and maintenance instructions
Electric submersible pumps for sewage
3.2 USE LIMITS
For all electric pumps respect following limits:
- Max. immersion depth : 20 m
- Running positioning : only vertical
- Max. time of running at delivery 0 (closed gate-valve) : 2 ÷ 3 min.
- Max. starting per hour (equally distributed in the time:
GRINDER / GRINDER GL series:
30
FEKA/FEKA RC series: 20 with motor < 5,5 - 15 with motors >5,5
DRENAG/DIG seiries:
30
- Motor electric supply voltage :
± 10% of the plate value at 50 Hz and 60 Hz
3.3 SAFETY PRECAUTIONS
! IMPORTANT : Pay attention to the following contra-indications:
-
In areas with explosion risk, use electric submersible pumps equipped with explosion-proof motor only in
accordance with working conditions. (In compliance with local safety regulations and standards)
-
Don’t use the electric pump for liquids intended to human nourishment.
- The electropumps, in the standard version, must not be used in swimming pools, tanks, wells or systems
where there is even the remote possibility of persons coming in contact with the electropump or with the
liquid to be treated.
-
Never touch by hand the electric pump when running.
- Never use the electric pump when not immerged. The dry running, even if for a short time, could cause the
immediate breakage of all hydraulic and mechanic components.
-
During running the water level must cover totally the electric pump.
- Verify that the elctric pump and relevant equipment comply with local safety regulations and standards.
Confomity and warranty foreseen by the general sale conditions will be no longer valid in case of modifications
made on the electric pump without the written acceptance of the manufacturer who will be not responsible of any
damage to persons, animals or things.
4. HANDLING AND STORAGE
4.1 HANDLING
-
To reduce risks during lifting and handling operations, be sure that all equipment are complying with safety
rules and suitable for the weight, dimensions and shape of the electric pump.
- Weight and dimensions of the electric pumps are indicated on table at pag. 35-37
- Never use the lead-out cable for handling or lifting the electric pump, but use the proper handle.
-
During handling keep electric cables rolled up (bending radius 10 times greater than the cable diameter.
Be sure that cable free ends are not inadvertitely immerged or, in any case, wetted.
Safeguard your hands during this operation.
4.2 STORAGE
- Electric pumps must be stored in covered, dry and well aerated rooms.
- Keep the electric pump in vertical position checking its stability in order to avoid dangerous falls.
- Be sure that electric pump and cables are not exposed to sunlight for long time.
- Electric pump must be througly cleaned after a running period and it is necessary to verify the condition of
different component.
- For cleaning don’t use detergents containing solvents or other hydrocarbon based products.
Содержание GRINDER GL
Страница 2: ......
Страница 4: ......
Страница 21: ...Note...
Страница 22: ......
Страница 39: ...Notes...
Страница 40: ......
Страница 57: ...Notes...
Страница 58: ......
Страница 75: ...Notizen...
Страница 76: ......
Страница 93: ...Notas...
Страница 94: ......
Страница 111: ...Notities...
Страница 112: ......
Страница 114: ...114 RU 1 1 1 1 2 2 1 2 2 Type Serial N Pn kW V Q A Cos H Ins CL IP IEC529 IP68 EN60034 5 RPM Hz F kg Year 1...
Страница 115: ...115 RU i EN 60335 1 02 I 70 3 3 1 6 11 2 1 Dab Pumps 40 C 104 F 8 FEKA GRINDER...
Страница 117: ...117 RU 4 4 1 125 127 10 4 2 5 5 1 3 2...
Страница 118: ...118 RU 5 2 6 5 2 1 5 50 200 5 2 3 3 4...
Страница 119: ...119 RU 5 2 2 6 7 7 7 C 7 D 1 2 3 4 5 6 7 8 9 10 11 12 5 3 IDN 30 7 D C B A 6...
Страница 122: ...122 RU 13 14 6 6 1 10 6 2 7 7 1...
Страница 123: ...123 RU 4000 8000 500 5 2 7 2 S 1 2 3 n 4 8 9 PPOM...
Страница 126: ...126 RU 10 1 A B C D E E C B A D DRENAG 500 900 DRENAG 1600 3000 FEKA GL DIG 1100 2200 DIG 3700 11000...
Страница 129: ......
Страница 130: ......
Страница 147: ...Anota es...
Страница 148: ......
Страница 150: ...GR 150 1 1 1 1 2 2 1 2 2 Type Serial N Pn kW V Q A Cos H Ins CL IP IEC529 IP 68 EN60034 5 RPM Hz F kg Year 1...
Страница 152: ...GR 152 20 m 2 3 GRINDER GRINDER GL 30 FEKA FEKA RC 20 5 5 15 5 5 DRENAG DIG 30 10 50Hz 60Hz 5 3 3 4 4 1 161 163...
Страница 153: ...153 GR 10 4 2 5 5 1 3 2 5 2 6...
Страница 154: ...GR 154 5 2 1 5 50 200 cm 5 2 2 6 7 A 7 B 7 C 5 2 3 3 4...
Страница 155: ...155 GR 7 D 1 2 3 4 5 6 7 8 9 10 11 12 5 3 IDN 30 mA 3 6 7 D C B A...
Страница 158: ...GR 158 6 6 1 5 6 2 7 7 1 4000 8000 500V 5MW 2MW...
Страница 159: ...159 GR 7 2 Dab Pumps 1 2 3 4 8 Dab Pumps 9 PPOM...
Страница 162: ...GR 162 10 1 A B C D E E C B A D DRENAG 500 900 DRENAG 1600 3000 FEKA GL DIG 1100 2200 DIG 3700 11000...
Страница 165: ......
Страница 166: ......
Страница 183: ...Note...
Страница 184: ......
Страница 201: ...Notlar...
Страница 202: ......
Страница 219: ...Pozn mky...
Страница 220: ......
Страница 237: ...Uwagi...
Страница 238: ......
Страница 255: ...Anm rkningar...
Страница 256: ......
Страница 273: ...Huomautuksia...
Страница 274: ......
Страница 291: ...291 K zi haszn lati s karbantart si Magyar Mer l szennyv z s csapad kv z szivatty khoz HU Notes...