Step
Action
5
Remove the red protective caps from the inlet and outlet of the flow cell and
connect the tubing with 1/16 inch fingertight connectors.
6
Mount the cell holder cover by pushing it onto the cell holder.
4 Installation
4.5 Installing the flow cells
4.5.1 UV Flow Cell 2 mm and UV Flow Cell 10 mm
Monitor UVis-920 Operating Instructions 29055049 AF
35