Installation and Test Operation
FM4 S6E2H-Series Starter Kit Guide, Doc. No. 002-11387 Rev. **
20
SW3 User Key Test
: This procedure is to test switch SW3. Key in
5
, and then press
SW3 on the starter board. The RGB LED (LED2) will glow green while SW3 is held down.
Release SW3 and press
Enter
to complete the test. It will display
OK.
Figure 2-15: SW3 User Key Test
Potentiometer Test
: This procedure tests the potentiometer. Key in
6
and "Turn Pot
clockwise/anti-clockwise" appear in the serial port viewer window depending on the
potentiometer
’s (R11) current position. When the potentiometer is turned clockwise from
the min to the max position, RGB LED (LED2) color changes from red to green to blue.
When turned anticlockwise, LED color varies from blue to green to red.
Figure 2-16: Potentiometer Test