ONE
16
Original instructions.
DANGER
!: If supply cord is damaged, it must be replaced
by the manufacturer, its service agent or similarly qualified
persons in order to avoid a hazard and SERIOUS INJURY OR
DEATH!
1.
The machine should only be connected to the power supply by qualified personnel. The following safety instructions should be
obeyed at all times.
2.
Ensure that the electrical requirements stated on the TECHNICAL SPECIFICATIONS and on the ratings plate located under the drip tray
inside the machine match the specifications of the power supply.
3.
Ensure that the domestic electrical supply where the machine is being installed is rated for and able to provide the power
required by the machine. Insufficient power supply, wiring, grounding, or insulation can result in overheating and
possibility of fire.
4.
The coffee machine must be connected to an earth grounded electrical outlet that complies with the regulations in force in the
country of installation.
5.
Ensure that a circuit breaker engineered for the power consumption of the machine is installed to protect the electrical supply,
as specified on the ratings plate located under the drip tray.
6.
Never connect the machine to the power supply via extension cords, plug adapters, or shared outlets.
· Electrical connection checklist
Machine:
Machine:
230Vac Ph+N
115Vac Ph+N
Blue
Brown
NEUTRAL
PHASE
Yellow/Green
Supply cable
Blue
Brown
NEUTRAL
PHASE
Yellow/Green
Supply cable
INSTALLATION AND START UP
Important
: The manufacturer will not be held
liable for damage to persons, animals or property
resulting from incorrect installation of the coffee
machine.
After carry out the machine installation, follow the next steps for the first start up:
1.
Ensure the machine’s tank is full of water or domestic water supply is opened at the tap. For the first installation is
recommended to refill the water tank manually.
2.
Open the steam tap and turn the main power switch on. The machine will refill automatically the steam boiler first (you will hear
the pump working).
3.
The pump will stop when the steam boiler is completely filled. Close the steam tap.
3a.
On 1B versions, when the heating signal lits up, pull the group lever up until water starts to brew in the group head.
Then, pull the lever down and wait until the heating signal turns off.
3b.
On 2B versions, a 1st installation routine is enabled by software. So, the machine will require to pull the group lever
up by showing the icon (fig. 1) on the display. A 90s countdown will start to refill the group boiler. Ensure that water is
coming out of the group head when the countdown arrives to 0. Now the heating process will start. Wait until both boilers
are heated up.
4.
Open the steam tap to ensure that it is working and release the air inside the boiler.
5.
Check again if water tank needs to be refilled and proceed to operate with the machine.
Do not place wet cups directly on the cup shelf. Always thoroughly dry any cups
before storing them on the warming shelf.
WARNING
!:
Allowing water to drip into the machine can cause mechanical
and electrical damage.
· Initial starting procedure
· Machine handling tips
ONE 2B 1st start up group boiler refill icon