Assembly
© Copyright 2005, Creative Playthings
Williamsburg
19687-100 rev s (10-17)
Page 16
ASSeMbly inStruCtionS
SteP 21 - front wall Slats:
Fasten three Wall slats (v) to the front Platform end (W)
and the front end Tent support (X), as shown. use four #8 x
1-5/8" Flat head Wood screws in each Wall slat (v). There
should be approximately 2-1/2" between each Wall slat (v).
The bottom of all Wall slats should be spaced approximately
1/2" above the platform surface.
note: When placing Wall slats, leave no gap larger than
3-1/2" except at entrance or exit points. The right Wall sup-
port has been omitted from the illustration for clarity.
v
X
W
SteP 19 - tent Post:
Fasten one Tent Post (Y) to the front end Tent support (X)
using two 2-1/2" hex bolt assemblies, as shown. repeat
with the other Tent Post (Y) and the rear end Tent support
(X). make sure that the each Tent Post is perpendicular to the
adjacent end Tent support before tightening the fasteners.
SteP 20 - Center tent Pipe:
Fit one of the 61" Tent Pipes (ab) into the holes at the top
of the Tent Posts (Y) installed in the previous step. hold the
Tent Pipe in place inside one of the Tent Posts. use a 1/8"
diameter high speed steel drill to bore a pilot hole through
one side of the Tent Post and one wall of the steel Tent Pipe.
secure the Tent Pipe to the Tent Post using one #8 x 1-5/8"
Wood screw.
make sure that the two Tent Posts are plumb and
perpendicular to the gym before securing the other end of
the Tent Pipe to the other Tent Post with the pilot drill and a
Wood screw, as above.
Y
X
Y
X
ab
Y
Y
This Wall slat layout is based on no accessories being
mounted that require an opening for access. Placement of
Wall slats can vary depending on accessories.