Assembly
Williamsburg
19687-100 rev s (10-17)
© Copyright 2005, Creative Playthings
Page 11
ASSeMbly inStruCtionS
SteP 4 - Platform ends:
Fasten the Platform ends (W) to the Corner Posts (F) using
four 5/16 x 4" hex bolt assemblies each.
SteP 6 - outside Stringers:
locate the two outside stringers (h). The outside stringers (h)
are installed to the inside of the left and right Corner Posts
(F). attach each outside stringer (h) using two 5/16 x
5-1/2" hex bolt assemblies as shown. The hex bolt should
start from the outside of the gym. Push each bolt through
the bottom hole in the left or right Platform sides
and the Corner Posts before passing through the
outside stringer. make sure the Platform sides
(Q) and outside stringers (h) are aligned
across their bottom edges. (The holes in the
outside stringers are offset from the center of
the board; you may have to flip the board to
achieve proper alignment.)
note: one Platform end has been omitted from
the illustration for clarity.
W
left
right
Front
(slide)
back
Q
Q
W
Q
Q
W
h
SteP 5 - Short tent Pipes:
slide one 56-1/2" Tent Pipe (aa) into the large hole in the
front of the left rear Corner Post. slide the other end into the
hole in the back of the left front Corner Post. one of the bolts
holding the left Platform side (Q) may need to be loosened
or removed. repeat with the other 56-1/2" Tent Pipe (aa)
and the right Corner Posts. restore and tighten the bolts
holding the Platform sides.
aa
Q
aa