33
Peristaltic Pumps Series IP 100-800
Once the pumping hose has reached the
opening on the pressure side of the pump
housing switch off the pump and guide the
pumping hose with a round steel bar through
the opening in the pump housing (do not
use any tools with sharp edges). Switch
the pump on again for a short moment, so
that the correct installation position can be
reached.
Pumping hoses are delivered in correct
installation lengths. The correct installation
position is reached when the hose section
protruding from the opening in the pump
housing matches the non-threaded part of
the studs (Fig. 40).
The vacuum bores in the hose
must be exactly in line. The hose
must not be twisted during
installation.
If the hoses protrudes too far out of the
pump housing on the pressure side, it must
be completely removed and reassembled
again.
Fig. 40
4. Completely assemble the connecting socket
on the pressure side. Start by assembling
the new O-ring to the step ring (Fig. 41).
X
1 Retaining ring
2 O-ring
1
2
Fig. 41
Fig. 42
Then assemble the segment ring with the
help of a retaining rubber (Fig. 42). This
retaining rubber helps to keep the individual
segments in position.
Slightly lubricate the ventilation pipe
(pressure side) with lubricating fluid and
push it into the small hose bore and lay it
into the groove in the retaining ring (narrow).
Then insert the connecting socket carefully
into the pumping hose and tighten the
retaining flange evenly.
3
4
3 Segment ring
4 Retaining rubber
Attention!