Preparing to Start the Deep Well Pump 

9

 Risk of burns . Never run pump dry. Running pump without 

water may cause pump to overheat, damaging seal and possibly causing 
burns to persons handling pump. Fill pump with water before starting.

 Risk of explosion and scalding . Never run pump against closed 

discharge. To do so can boil water inside pump, causing hazardous pressure 
in unit, risk of explosion and possibly scalding persons handling pump.
1.  Open the pressure regulator as far as possible without backing it out 

of the regulator body. Then remove the regulator from the pump and 
fill the pump, fill all piping between the pump and the well, and 
make sure that all piping in the well is full. If you have also installed a 
priming tee in the suction piping, remove the plug from the tee and fill 
the suction piping (see Figure 10).

2.  Replace all fill plugs and close the pressure regulator completely 

(Figure 11).

3.  Power on! Start the pump and watch the pressure gauge. The pressure 

should build rapidly to about 50 PSI as the pump primes.

4.  After 2 or 3 minutes, the gauge should show pressure. If not, stop the 

pump, remove the fill plugs, reopen the control valve, and refill the 
pump and piping. You may have to repeat this two or three times in 
order to get all the trapped air out of the piping. Don’t forget to close 
the control valve each time before you start the pump.

5.  When pressure has built up and stabilized at about 50 PSI, slowly open 

the control valve (see Figure 12) and let the pressure drop until the 
pressure gauge needle starts to flutter or drops to 0. When the needle 
flutters or drops, close the valve just enough to stop the flutter or bring 
the needle back to a stable pressure (see Figure 12). Your pump is now 
operating at its most efficient point.

6.  After the pump has built up pressure in the system and shut off, check 

the pressure switch operation by opening a faucet or two and running 
enough water out to bleed off pressure until the pump starts. The pump 
should start when pressure drops to 30 PSI and stop when pressure 
reaches 50 PSI. Run the pump through one or two complete cycles to 
verify correct operation. This will also help clean the system of dirt and 
scale dislodged during installation.

Congratulations on a successful installation.
If you were unsuccessful, please refer to Troubleshooting or call our 
customer service technical staff.

Remove pressure

regulator and fill

pump and 

suction piping

through opening.

5977 0309

Figure 11 - Prime Pump

Figure 12 - Set Control Valve

A-SLOWLY open Pressure Regulator

B-Watch for Gauge to Flutter or Drop

C-Close Pressure Regulator until

    Pressure Stabilizes

5979 0309

Figure 10 - Fill Pump

5978 0309

Replace pressure 

regulator and all 

fill plugs, 

reconnect the 

hose, and close 

the regulator 

completely

Содержание CL520CT7

Страница 1: ...tallation Operation Parts For further operating installation or maintenance assistance Call 800 535 4950 English Pages 2 13 Instalaci n Operaci n Piezas Para mayor informaci n sobre el funcionamiento...

Страница 2: ...ing or handling pump If in doubt consult a qualified electrician General Safety Risk of burns Do not touch an operating motor Motors are designed to operate at high temperatures To avoid burns when se...

Страница 3: ...rental applications Sewage Pumps DO NOT return a sewage pump that has been installed to your retail store Contact CountyLine Customer Service Sewage pumps that have seen service and been removed carr...

Страница 4: ...pump body Replace it with a 1 NPT close nipple a 1 x1 x3 4 NPT Tee and a 1 NPT pipe plug Install the pressure gage in the plugged hole in the pump body see Figure 1 3 Install the ejector kit Follow th...

Страница 5: ...r connecting two or three well points to one suction pipe All Shallow Well Installations 6 Install a priming tee priming plug and suction pipe to the pump see Figures 4 and 5 Connect the pipe from the...

Страница 6: ...completed the plumbing for your new pump Please go to Electrical for electrical connections 2 Well 1 Install the pressure regulator and pressure gauge in the pump body See Figure 1 2 Mount the pump a...

Страница 7: ...change the selection 1 2 HP motors are preset at the factory for 115 volts 5 To change the voltage if necessary remove the motor capacitor cover and slide the switch fully to the correct voltage 6 Rei...

Страница 8: ...ation Connection Procedure 1 Connect the ground wire first as shown in Figure 8 The ground wire must be a solid copper wire at least as large as the power supply wires 2 There must be a solid metal co...

Страница 9: ...ping Don t forget to close the control valve each time before you start the pump 5 When pressure has built up and stabilized at about 50 PSI slowly open the control valve see Figure 12 and let the pre...

Страница 10: ...ld pump water in two or three minutes 4 If you don t have water after 2 or 3 minutes stop the pump and remove the fill plugs Refill the pump and piping You may have to repeat this two or three times i...

Страница 11: ...lve and or strainer are buried in sand or mud Raise foot valve and or strainer above bottom of water source Clean foot valve and strainer Water level is too low for shallow well setup to deliver water...

Страница 12: ...eep Well Pump CL520CT7 Part Description Part Number Seal and O Ring Kit RPK 35 Overhaul Kit RPK 205DW Ejector Kit FP520 100 Pump Body Assembly R176 72 Pressure Switch 30 50 TC2151 Pressure Switch Tubi...

Страница 13: ...4 37R 6 3 4 NPT x 1 Hose Barb Adapter 1 24206A004 7 3 4 NPT x 3 4 NPT x 3 4 NPT Street Tee 1 05002A001 8 5 16 18 Flanged Nuts 6 U36 202BT 9 Tank Flange 1 U31 442P Tank Bladder 1 U20 7 10 Tank Body 1 1...

Страница 14: ...e un motor en operaci n Los motores est n dise ados para operar a temperaturas altas Para evitar quemaduras al realizar el servicio a una bomba d jela enfriar por 20 minutos despu s de apagarla No per...

Страница 15: ...productos utilizados en aplicaciones comerciales o de alquiler Bombas cloacales NO devuelva una bomba cloacal que se haya instalado a su tienda minorista Comun quese con el Departamento de Atenci n al...

Страница 16: ...bajar en ella o en el motor 1 Drene y retire la bomba vieja Revise las condiciones de la tuber a que no tenga xido sarro etc y reempl cela si es necesario 2 Saque el regulador de pres on del cuerpo de...

Страница 17: ...o 4 Coloque la bomba lo m s cerca posible del pozo vea la Figura 5 5 Si un punto filtrante no suministra suficiente agua considere la posibilidad de conectar dos o tres puntos filtrantes a una tuber a...

Страница 18: ...informaci n sobres las conexiones el ctricas Pozo de 2 1 Instale el regulador de presi n y el man metro en el cuerpo de la bomba Vea la Figura 1 2 Monte la bomba tan cerca del pozo como sea posible 3...

Страница 19: ...de 1 2 HP vienen pre configurados de f brica para 115 voltios 5 Para cambiar el voltaje si es necesario saque la cubierta del condensador del motor y deslice el conmutador totalmente para corregir el...

Страница 20: ...necte el alambre de puesta a tierra primero seg n se ilustra en la Figura 8 El alambre de puesta a tierra debe ser un alambre de cobre s lido por lo menos tan grande como los alambres de suministro de...

Страница 21: ...lvula de control y vuelva a llenar la bomba y la tuber a Posiblemente tendr que repetir esto dos o tres veces para sacar todo el aire atrapado en la tuber a No olvide cerrar la v lvula de control cad...

Страница 22: ...a colocar todos los tapones de llenado 3 Enci ndala Arranque la bomba La bomba debe bombear agua despu s de 2 o 3 minutos 4 Si no tiene agua despu s de 2 o 3 minutos pare la bomba y retire todos los t...

Страница 23: ...el colector est n enterrados en arena o en lodo Eleve la v lvula de pie y o el colector por encima del fondo de la fuente de agua Limpie la v lvula de pie y el colector El nivel de agua es demasiado b...

Страница 24: ...4 NPT 2 tapones de 1 2 NPT Unidad del cuerpo de la bomba pozo poco profundo 2 6 13 14 15 tapones de 1 4 NPT 2 tapones de 1 2 NPT Man stato 3 Juego de tuber a del man stato 6 3 7 Ref Descripci n Cant...

Страница 25: ...ervadura de manguera de 3 4 NPT x 1 1 24206A004 7 T macho hembra de 3 4 NPT x 3 4 NPT x 3 4 NPT 1 05002A001 8 Tuercas embridadas de 5 16 18 6 U36 202BT 9 Brida del tanque 1 U31 442P C mara del tanque...

Страница 26: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 27: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 28: ......

Отзывы: