CountyLine CL520CT7 Скачать руководство пользователя страница 17

5988 0409

To Household

Water System

Suction Pipe

From Well

Replace Pressure 

Regulator with

Priming Tee

(see fig. 1)

Priming

Tee and

Plug

Relief Valve

Drive

Coupling

Drive

Point

Check

Valve

5974 0309 WG

To Household

Water System

Suction Pipe

From Well

Priming

Tee and

Plug

Well

Casing

Foot

Valve

Sanitary

Well Seal

Strainer

5-10'

At least

10'

Relief Valve

Replace Pressure 

Regulator with

Priming Tee

(see fig. 1)

Instalación de una nueva bomba convertible 

17

Instalaciones de pozos poco profundos

1.  Saque la regulador de presión del cuerpo de la bomba. Reemplácela con una 

entrerrosca bicónica de 1” NPT, un Té de 1” x 1” x 3/4” NPT, y un tapón para 
tubería de 1” NPT. Instale el manómetro en el orificio tapado en el cuerpo de la 
bomba (vea la Figura 1).

2.  Instale el juego del eyector. Siga las instrucciones indicadas en el juego. El venturi 

debe quedar alineado con el orificio superior en la parte delantera de la bomba 
(vea la Figura 2).

In stalación de pozo entubado, tubería de 

revestimiento de 2” o mayor

3.  Coloque la bomba lo más cerca posible del pozo. Conecte la tubería desde el 

pozo a la toma de aspiración de la bomba, usando la menor cantidad posible de 
accesorios - especialmente codos - ya que los accesorios aumentan la fricción en 
la tubería.

4.  Ensamble la válvula de pie, el colector y la tubería del pozo (vea la Figura 5). 

Verifique que la válvula de pie funcione libremente.

5.  Baje la tubería por el pozo hasta que el colector quede a cinco pies por encima 

del fondo del pozo. También deberá estar al menos 10 pies por debajo del nivel 
del agua del pozo mientras la bomba está marchando, para impedir que la bomba 
aspire aire. Instale una junta sanitaria para pozos.

Instalación del punto filtrante

3.  Hinque el pozo usando “manguitos de tubería de hincar” y un “casquete de 

hincar”. Los “accesorios de hincar” vienen completamente fileteados y permiten 
que los extremos de la tubería se empalmen entre sí, de manera que la fuerza de 
hincar del mazo se transmita por la tubería y no por las roscas. Los accesorios 
comunes que se encuentran en las ferreterías no vienen completamente fileteados 
y se pueden desplomar bajo el impacto. Además, los “accesorios de hincar” son 
más lisos que los accesorios comunes de plomería, lo cual facilita la penetración en 
el suelo.

4.  Coloque la bomba lo más cerca posible del pozo (vea la Figura 5).
5.  Si un punto filtrante no suministra suficiente agua, considere la posibilidad de 

conectar dos o tres puntos filtrantes a una tubería de aspiración.

Todas las instalaciones de pozos poco profundos

6.  Instale un té de cebar, un tapón de cebar, y una tubería de aspiración a la bomba 

(vea las Figuras 4 y 5). Conecte la tubería desde el pozo a la toma de aspiración 
de la bomba, usando la menor cantidad posible de accesorios - especialmente 
codos - ya que los accesorios aumentan la fricción en la tubería. El tee de cebado 
es opcional.
•  La tubería de aspiración debe ser al menos tan grande como la toma 

de aspiración en la bomba (incluya una válvula de retención - vea las 
Figuras 4 y 5).

•  Proporcione un soporte para la tubería, para que no hayan caídas ni 

combaduras en la misma, evitando que ejerza demasiada tensión sobre el 
cuerpo de la bomba y haciendo que se incline ligeramente hacia arriba desde 
el pozo hacia la bomba (los puntos altos pueden provocar bolsas de aire que 
obturarán la bomba).

•  Selle las juntas de la tubería de succión con cinta  sellante de PTFE para roscas 

de tubería o con un compuesto a base de PTFE especial para las juntas de las 
tuberías. Si la tubería de aspiración puede aspirar aire, la bomba no podrá 
extraer agua del pozo.

7.  Haga correr la tubería desde el té de descarga en la brida del tanque hasta la 

tubería de la casa. La tubería de descarga debe ser al menos tan grande como el 
té del tanque. Instale una válvula de descarga en la tubería de descarga, capaz de 
pasar todo el flujo de la bomba a 75 psi. Haga correr una tubería desde la válvula 
de descarga al drenaje en el piso, o hasta otro lugar conveniente para evacuar 
el agua.

Usted ha terminado de instalar la plomería del pozo para su nueva bomba. Vaya a la 
Electricidad para obtener información sobres las conexiones eléctricas.

Figura 4 - Instalación de pozo recubierto

Figura 5 - Instalación del punto filtrante

Válvula de alivio

Tubería de succión 

del pozo

“T” y tapón 

para cebar

Sello sanitario 

para pozo

Válvula 

de 

retención

Filtro

 5-10’

Por lo 

menos 10’

Al sistema doméstico 

de agua

Recubrimiento del pozo

Reemplazar el regulador de 

presión por un Té de cebar 

(vea la Fig. 1)

Tubería de succión 

del pozo

“T” y tapón 

para Cebar

Válvula de alivio

Al sistema doméstico 

de agua

Reemplazar el regulador de 

presión por un té de cebar 

(vea la Fig. 1)

Válvula de 

retención

Manguito de 

tubería de hincar

Punto filtrante

Содержание CL520CT7

Страница 1: ...tallation Operation Parts For further operating installation or maintenance assistance Call 800 535 4950 English Pages 2 13 Instalaci n Operaci n Piezas Para mayor informaci n sobre el funcionamiento...

Страница 2: ...ing or handling pump If in doubt consult a qualified electrician General Safety Risk of burns Do not touch an operating motor Motors are designed to operate at high temperatures To avoid burns when se...

Страница 3: ...rental applications Sewage Pumps DO NOT return a sewage pump that has been installed to your retail store Contact CountyLine Customer Service Sewage pumps that have seen service and been removed carr...

Страница 4: ...pump body Replace it with a 1 NPT close nipple a 1 x1 x3 4 NPT Tee and a 1 NPT pipe plug Install the pressure gage in the plugged hole in the pump body see Figure 1 3 Install the ejector kit Follow th...

Страница 5: ...r connecting two or three well points to one suction pipe All Shallow Well Installations 6 Install a priming tee priming plug and suction pipe to the pump see Figures 4 and 5 Connect the pipe from the...

Страница 6: ...completed the plumbing for your new pump Please go to Electrical for electrical connections 2 Well 1 Install the pressure regulator and pressure gauge in the pump body See Figure 1 2 Mount the pump a...

Страница 7: ...change the selection 1 2 HP motors are preset at the factory for 115 volts 5 To change the voltage if necessary remove the motor capacitor cover and slide the switch fully to the correct voltage 6 Rei...

Страница 8: ...ation Connection Procedure 1 Connect the ground wire first as shown in Figure 8 The ground wire must be a solid copper wire at least as large as the power supply wires 2 There must be a solid metal co...

Страница 9: ...ping Don t forget to close the control valve each time before you start the pump 5 When pressure has built up and stabilized at about 50 PSI slowly open the control valve see Figure 12 and let the pre...

Страница 10: ...ld pump water in two or three minutes 4 If you don t have water after 2 or 3 minutes stop the pump and remove the fill plugs Refill the pump and piping You may have to repeat this two or three times i...

Страница 11: ...lve and or strainer are buried in sand or mud Raise foot valve and or strainer above bottom of water source Clean foot valve and strainer Water level is too low for shallow well setup to deliver water...

Страница 12: ...eep Well Pump CL520CT7 Part Description Part Number Seal and O Ring Kit RPK 35 Overhaul Kit RPK 205DW Ejector Kit FP520 100 Pump Body Assembly R176 72 Pressure Switch 30 50 TC2151 Pressure Switch Tubi...

Страница 13: ...4 37R 6 3 4 NPT x 1 Hose Barb Adapter 1 24206A004 7 3 4 NPT x 3 4 NPT x 3 4 NPT Street Tee 1 05002A001 8 5 16 18 Flanged Nuts 6 U36 202BT 9 Tank Flange 1 U31 442P Tank Bladder 1 U20 7 10 Tank Body 1 1...

Страница 14: ...e un motor en operaci n Los motores est n dise ados para operar a temperaturas altas Para evitar quemaduras al realizar el servicio a una bomba d jela enfriar por 20 minutos despu s de apagarla No per...

Страница 15: ...productos utilizados en aplicaciones comerciales o de alquiler Bombas cloacales NO devuelva una bomba cloacal que se haya instalado a su tienda minorista Comun quese con el Departamento de Atenci n al...

Страница 16: ...bajar en ella o en el motor 1 Drene y retire la bomba vieja Revise las condiciones de la tuber a que no tenga xido sarro etc y reempl cela si es necesario 2 Saque el regulador de pres on del cuerpo de...

Страница 17: ...o 4 Coloque la bomba lo m s cerca posible del pozo vea la Figura 5 5 Si un punto filtrante no suministra suficiente agua considere la posibilidad de conectar dos o tres puntos filtrantes a una tuber a...

Страница 18: ...informaci n sobres las conexiones el ctricas Pozo de 2 1 Instale el regulador de presi n y el man metro en el cuerpo de la bomba Vea la Figura 1 2 Monte la bomba tan cerca del pozo como sea posible 3...

Страница 19: ...de 1 2 HP vienen pre configurados de f brica para 115 voltios 5 Para cambiar el voltaje si es necesario saque la cubierta del condensador del motor y deslice el conmutador totalmente para corregir el...

Страница 20: ...necte el alambre de puesta a tierra primero seg n se ilustra en la Figura 8 El alambre de puesta a tierra debe ser un alambre de cobre s lido por lo menos tan grande como los alambres de suministro de...

Страница 21: ...lvula de control y vuelva a llenar la bomba y la tuber a Posiblemente tendr que repetir esto dos o tres veces para sacar todo el aire atrapado en la tuber a No olvide cerrar la v lvula de control cad...

Страница 22: ...a colocar todos los tapones de llenado 3 Enci ndala Arranque la bomba La bomba debe bombear agua despu s de 2 o 3 minutos 4 Si no tiene agua despu s de 2 o 3 minutos pare la bomba y retire todos los t...

Страница 23: ...el colector est n enterrados en arena o en lodo Eleve la v lvula de pie y o el colector por encima del fondo de la fuente de agua Limpie la v lvula de pie y el colector El nivel de agua es demasiado b...

Страница 24: ...4 NPT 2 tapones de 1 2 NPT Unidad del cuerpo de la bomba pozo poco profundo 2 6 13 14 15 tapones de 1 4 NPT 2 tapones de 1 2 NPT Man stato 3 Juego de tuber a del man stato 6 3 7 Ref Descripci n Cant...

Страница 25: ...ervadura de manguera de 3 4 NPT x 1 1 24206A004 7 T macho hembra de 3 4 NPT x 3 4 NPT x 3 4 NPT 1 05002A001 8 Tuercas embridadas de 5 16 18 6 U36 202BT 9 Brida del tanque 1 U31 442P C mara del tanque...

Страница 26: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 27: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 28: ......

Отзывы: