CountyLine CL520CT7 Скачать руководство пользователя страница 18

Suction (Larger)

Pipe from Well

To Household

Water System

Well

Head

Drive (Smaller)

Pipe to Well

Venturi

Nozzle

Ejector

Foot Valve

Strainer

5975 0309

Relief 

Valve

Pressure Regulator,

Gauge, and Priming

Plug

Suction (Larger)

Pipe from Well

To Household

Water System

Relief 

Valve

Pressure Regulator,

Gauge, and Priming

Plug

41

JET  NO

.

J32P-

24

Casing

Adapter

Drive (Smaller)

Pipe to Well

Well Casing

serves as

Drive Pipe

Suction Pipe

Venturi

Nozzle

Ejector

5976 0309

Instalación de una nueva bomba convertible 

18

Pozo de 4” ó mas

1.  Instale el regulador de presión y el manómetro en el cuerpo de la bomba. Vea la 

Figura 1.

2.  Ensamble el juego del eyector. Vea la Figura 6. Siga las instrucciones que vienen 

incluidas en el kit para ajustar la boquilla y el venturi a las condiciones de su pozo.

3.  Monte la bomba tan cerca del pozo como sea posible.
4.  Conecte las dos tuberías (1” la de sondeo, 1-1/4” la de succión) al eyector y baje 

el eyector hacia el pozo hasta que el filtro se encuentre a cinco pies del fondo. 
También debe estar a por lo menos 10 pies debajo del nivel de agua del pozo 
cuando la bomba esté funcionando a fin de evitar que la bomba succione aire.

5.  Instale un sello sanitario para pozo y conecte la tubería del eyector a la bomba. 

Utilice boquillas de acero a través del sello del pozo con tubería flexible de 
polietileno para evitar aplastar la tubería de plástico al ajustar el sello.

6.  Soporte la tubería para que no haya inclinaciones verticales o hundimientos en 

ella a fin de que no ejerza tensión sobre el cuerpo de la bomba y con el propósito 
de que no se incline ligeramente hacia arriba desde el pozo hacia la bomba (los 
puntos altos pueden ocasionar que se formen bolsas de aire que pueden bloquear 
la bomba). Selle las juntas de la tubería de succión con cinta  sellante de PTFE 
para roscas de tubería o con un compuesto a base de PTFE especial para las juntas 
de las tuberías. Las juntas deben ser a prueba de agua y estar herméticamente 
cerradas. Si la tubería de succión pudiera succionar aire, la bomba no podrá sacar 
agua del pozo.

7.  Haga correr la tubería desde el té de descarga en la brida del tanque hasta la 

tubería de la casa. La tubería de descarga debe ser al menos tan grande como el 
té del tanque. Instale una válvula de descarga en la tubería de descarga, capaz de 
pasar todo el flujo de la bomba a 75 psi. Haga correr una tubería desde la válvula 
de descarga al drenaje en el piso, o hasta otro lugar conveniente para evacuar 
el agua.

Usted ha terminado de instalar la plomería del pozo para su nueva bomba. Vaya a la 
Electricidad para obtener información sobres las conexiones eléctricas.

Pozo de 2”

1.  Instale el regulador de presión y el manómetro en el cuerpo de la bomba. Vea la 

Figura 1.

2.  Monte la bomba tan cerca del pozo como sea posible.
3.  Ensamble el juego del eyector, la tubería del pozo y el adaptador de cabeza del 

pozo de acuerdo con las instrucciones que vienen incluidas en el paquete del 
eyector. Vea la Figura 7. Utilice tubo galvanizado de caída con juntas invertidas 
para lograr un flujo adecuado. Siga las instrucciones incluidas en el kit para ajustar 
la boquilla y el venturi a las condiciones de su pozo.

4.  Conecte las dos tuberías (una tubería de sondeo más pequeña y una más grande de 

succión) del pozo a la bomba. Soporte la tubería para que no haya inclinaciones 
verticales o hundimientos en ella a fin de que no ejerza tensión sobre el cuerpo de 
la bomba y con el propósito de que no se incline ligeramente hacia arriba desde el 
pozo hacia la bomba (los puntos altos pueden ocasionar que se formen bolsas de 
aire que pueden bloquear la bomba). Selle las juntas de la tubería de succión con 
cinta  sellante de PTFE para roscas de tubería o con un compuesto a base de PTFE 
especial para las juntas de las tuberías. Las juntas deben ser a prueba de agua y 
estar herméticamente cerradas. Si la tubería de succión pudiera succionar aire, la 
bomba no podría sacar agua del pozo.

5.  Haga correr la tubería desde el té de descarga en la brida del tanque hasta la 

tubería de la casa. La tubería de descarga debe ser al menos tan grande como el 
té del tanque. Instale una válvula de descarga en la tubería de descarga, capaz de 
pasar todo el flujo de la bomba a 75 psi. Haga correr una tubería desde la válvula 
de descarga al drenaje en el piso, o hasta otro lugar conveniente para evacuar 
el agua.

Usted ha terminado de instalar la plomería del pozo para su nueva bomba. Vaya a la 
Electricidad para obtener información sobres las conexiones eléctricas.
AVISO El juego de eyector suministrado con su sistema de tanque-bomba no 
funcionará con pozos de 2”. El juego de repuesto número FPAP2-P2 y el adaptador del 
revestimiento del pozo J216-16A se deben adquirir por separado.

Figura 6 - Pozos Profundos de 4” y 

Más Grandes

Figura 7 - 2 pulg. (Tubo Sencillo) 

pozo profundo

Válvula de 

alivio

Línea de Sondeo al Pozo 

(Más Pequeña)

Al sistema doméstico 

de agua

Venturi

Eyector

Boquilla

Válvula de retención

Filtro

Cabeza del 

pozo

Al sistema doméstico 

de agua

Tubería de succión

Boquilla

Eyector

El revestimiento del 

pozo sirve como 

tubería de sondeo

Válvula de 

alivio

Cabeza del 

pozo

Tubería de Succión del Pozo 

(Más Grande)

Línea de Sondeo al Pozo 

(Más Pequeña)

Pas à

l’échelle

Venturi

Regulador de presión, 

manómetro y tapón de cebar

Tubería de Succión del 

Pozo (Más Grande)

Regulador de presión, 

manómetro y tapón de cebar

Содержание CL520CT7

Страница 1: ...tallation Operation Parts For further operating installation or maintenance assistance Call 800 535 4950 English Pages 2 13 Instalaci n Operaci n Piezas Para mayor informaci n sobre el funcionamiento...

Страница 2: ...ing or handling pump If in doubt consult a qualified electrician General Safety Risk of burns Do not touch an operating motor Motors are designed to operate at high temperatures To avoid burns when se...

Страница 3: ...rental applications Sewage Pumps DO NOT return a sewage pump that has been installed to your retail store Contact CountyLine Customer Service Sewage pumps that have seen service and been removed carr...

Страница 4: ...pump body Replace it with a 1 NPT close nipple a 1 x1 x3 4 NPT Tee and a 1 NPT pipe plug Install the pressure gage in the plugged hole in the pump body see Figure 1 3 Install the ejector kit Follow th...

Страница 5: ...r connecting two or three well points to one suction pipe All Shallow Well Installations 6 Install a priming tee priming plug and suction pipe to the pump see Figures 4 and 5 Connect the pipe from the...

Страница 6: ...completed the plumbing for your new pump Please go to Electrical for electrical connections 2 Well 1 Install the pressure regulator and pressure gauge in the pump body See Figure 1 2 Mount the pump a...

Страница 7: ...change the selection 1 2 HP motors are preset at the factory for 115 volts 5 To change the voltage if necessary remove the motor capacitor cover and slide the switch fully to the correct voltage 6 Rei...

Страница 8: ...ation Connection Procedure 1 Connect the ground wire first as shown in Figure 8 The ground wire must be a solid copper wire at least as large as the power supply wires 2 There must be a solid metal co...

Страница 9: ...ping Don t forget to close the control valve each time before you start the pump 5 When pressure has built up and stabilized at about 50 PSI slowly open the control valve see Figure 12 and let the pre...

Страница 10: ...ld pump water in two or three minutes 4 If you don t have water after 2 or 3 minutes stop the pump and remove the fill plugs Refill the pump and piping You may have to repeat this two or three times i...

Страница 11: ...lve and or strainer are buried in sand or mud Raise foot valve and or strainer above bottom of water source Clean foot valve and strainer Water level is too low for shallow well setup to deliver water...

Страница 12: ...eep Well Pump CL520CT7 Part Description Part Number Seal and O Ring Kit RPK 35 Overhaul Kit RPK 205DW Ejector Kit FP520 100 Pump Body Assembly R176 72 Pressure Switch 30 50 TC2151 Pressure Switch Tubi...

Страница 13: ...4 37R 6 3 4 NPT x 1 Hose Barb Adapter 1 24206A004 7 3 4 NPT x 3 4 NPT x 3 4 NPT Street Tee 1 05002A001 8 5 16 18 Flanged Nuts 6 U36 202BT 9 Tank Flange 1 U31 442P Tank Bladder 1 U20 7 10 Tank Body 1 1...

Страница 14: ...e un motor en operaci n Los motores est n dise ados para operar a temperaturas altas Para evitar quemaduras al realizar el servicio a una bomba d jela enfriar por 20 minutos despu s de apagarla No per...

Страница 15: ...productos utilizados en aplicaciones comerciales o de alquiler Bombas cloacales NO devuelva una bomba cloacal que se haya instalado a su tienda minorista Comun quese con el Departamento de Atenci n al...

Страница 16: ...bajar en ella o en el motor 1 Drene y retire la bomba vieja Revise las condiciones de la tuber a que no tenga xido sarro etc y reempl cela si es necesario 2 Saque el regulador de pres on del cuerpo de...

Страница 17: ...o 4 Coloque la bomba lo m s cerca posible del pozo vea la Figura 5 5 Si un punto filtrante no suministra suficiente agua considere la posibilidad de conectar dos o tres puntos filtrantes a una tuber a...

Страница 18: ...informaci n sobres las conexiones el ctricas Pozo de 2 1 Instale el regulador de presi n y el man metro en el cuerpo de la bomba Vea la Figura 1 2 Monte la bomba tan cerca del pozo como sea posible 3...

Страница 19: ...de 1 2 HP vienen pre configurados de f brica para 115 voltios 5 Para cambiar el voltaje si es necesario saque la cubierta del condensador del motor y deslice el conmutador totalmente para corregir el...

Страница 20: ...necte el alambre de puesta a tierra primero seg n se ilustra en la Figura 8 El alambre de puesta a tierra debe ser un alambre de cobre s lido por lo menos tan grande como los alambres de suministro de...

Страница 21: ...lvula de control y vuelva a llenar la bomba y la tuber a Posiblemente tendr que repetir esto dos o tres veces para sacar todo el aire atrapado en la tuber a No olvide cerrar la v lvula de control cad...

Страница 22: ...a colocar todos los tapones de llenado 3 Enci ndala Arranque la bomba La bomba debe bombear agua despu s de 2 o 3 minutos 4 Si no tiene agua despu s de 2 o 3 minutos pare la bomba y retire todos los t...

Страница 23: ...el colector est n enterrados en arena o en lodo Eleve la v lvula de pie y o el colector por encima del fondo de la fuente de agua Limpie la v lvula de pie y el colector El nivel de agua es demasiado b...

Страница 24: ...4 NPT 2 tapones de 1 2 NPT Unidad del cuerpo de la bomba pozo poco profundo 2 6 13 14 15 tapones de 1 4 NPT 2 tapones de 1 2 NPT Man stato 3 Juego de tuber a del man stato 6 3 7 Ref Descripci n Cant...

Страница 25: ...ervadura de manguera de 3 4 NPT x 1 1 24206A004 7 T macho hembra de 3 4 NPT x 3 4 NPT x 3 4 NPT 1 05002A001 8 Tuercas embridadas de 5 16 18 6 U36 202BT 9 Brida del tanque 1 U31 442P C mara del tanque...

Страница 26: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 27: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 28: ......

Отзывы: