W415-1007 / A / 07.18.12
30
RIGHT vENT INSTALLATION
NOTE
upflow Vent Right - condensate
trap must be installed on left side.
IMPORTANT:
• PRIME CONDENSATE TRAP WITH
WATER AND CUT DRAIN HOSES TO
PROPER LENGTH.
• CUT PRESSURE SWITCH TUBING
TO PROPER LENGTH.
FIGURE 17 - HORIzONTAL LEFT vENT AND DRAINING OPTION
LEFT vENT INSTALLATION
TOP vENT INSTALLATION
FIGURE 16 - UPFLOW vENT AND DRAINING OPTION CONTINUED
IMPORTANT:
• PRIME CONDENSATE TRAP WITH WATER AND CUT DRAIN HOSES TO PROPER LENGTH.
• CUT PRESSURE SWITCH TUBING TO PROPER LENGTH.
Содержание C95 SERIES
Страница 25: ...W415 1007 A 07 18 12 25 FIGURE 14A direct vent terminal clearances ...
Страница 26: ...W415 1007 A 07 18 12 26 FIGURE 14b non direct vent terminal clearances ...
Страница 56: ...W415 1007 A 07 18 12 56 23 0 service history 43 1 ...
Страница 57: ...W415 1007 A 07 18 12 57 44 1 24 0 notes ...