83
Pump
Inspection
Visual check for func-
tion and tightness
approx. 6 months
Maintenance
Rehearsal:
Before, during or after
the test run, check:
¾
The electrical
protection of the
system in accor-
dance with VDE
regulations
¾
Preprint of the
MAG (if available)
¾
Tightness of the
pump‘s sliding ring
seal
¾
Function of the
setback preventer
¾
Pump and flow
noise
¾
Tightness of the
system and fittings
¾
Cleanliness of the
plant
¾
Corrosion of plant
parts
approx. 1year
Drinking water
re-feeding
Inspection
Check of the safety
distance (water level
adjustment), the inlet
valve and the overflow
when the inlet is fully
open
approx. 1year
Level indicator
Inspection
Comparison of the
level in the storage
with the level indicator
(switching rainwater /
drinking water).
approx. 1year
Pipelines
Inspection
Check all visible cables
for condition, tightness,
fastening and external
corrosion
approx. 1year
Backlog closures
(if available)
Inspection
Actuating the operating
lock, if necessary, emer-
gency closure
approx. 1 month
Содержание Flow Box
Страница 1: ...1 REGEN MEISTER MIT FÜLLSTANDSENSOR RAIN CHAMPION WITH LEVEL SENSOR D GB ...
Страница 2: ...2 ...
Страница 3: ...3 Technische Änderungen vorbehalten Für Druckfehler wird keine Haftung übernommen ...
Страница 87: ...87 ...