20
Hardware Installation
This section describes how to install the CNGE8FX4TX4MS Switch and the installation steps.
Installation Steps
1.
Unpack the switch from carton.
2.
Check the DIN-Rail is screwed on the Switch. If the DIN-Rail mount is not attached to
the switch, please refer to
DIN-Rail Mounting
section
for DIN-Rail mounting
installation. If you want to wall mount the switch, then please refer to
Wall Mount Plate
Mounting
section
for wall mount plate installation.
3.
To hang the switch on the DIN-Rail track or wall, please refer to the
Mounting
Installation section
.
4.
Power on the switch. To wire power for the switch, please refer to the
Wiring the Power
Inputs section
. The power LED on the switch will illuminate. Please refer to the
LED
Indicators section
for the meaning of the LED lights.
5.
Prepare the twisted-pair, straight-through Category 5e (or above) cable for the Ethernet
connection and SFP transceiver for the fiber connection.
6.
Insert one side of Category 5e (or above) cables into the switch Ethernet port (RJ45 port)
and the other side of Category 5e (or above) cables to the network device’s Ethernet
port (RJ45 port), ex: switch, PC or Server. The UTP port (RJ45) LED on the switch will
illuminate when the cable is connected to the network device. Please refer to the
LED
Indicators section
for LED light meaning.
Note
Be sure the connected network devices support MDI/MDI-X. If it does not
support, then use the crossover category 5e (or above) cable.
7.
For the SFP (mini-GBIC) port, please refer to the Cabling segment.
8.
When all connections are set and LED lights illuminate normal, the installation is
complete.
Содержание CNGE8FX4TX4MS
Страница 6: ......
Страница 22: ...16 2 Push down the metal loop and pull the SFP out by the plastic part Pull out from the SFP receptacle...
Страница 60: ...54 Main interface Main interface...
Страница 99: ...93 QoS Configuration interface...