ADCP-90-606 • Rev C • May 2020
Page 53
© 2020
CommScope
. All Rights Reserved.
6. Route the patch cords from the center of the panel outward to either side of the panel or to
one side as shown in
.
Figure 66. Patch Cord Routing To Both Sides
9.2
RapidReel Cable Spool Tray Positions and How to Use Them
The cable spool tray has three positions: operation (home); cable payout (inward); and full
connector access (outward). The panel ships in the operation position with the spool locking tab
protruding through the right side of the panel shell as shown in
.
Figure 67. Operation (Home) Position (Panel Shown With Top Cover Cut Away)
26204-A
PATCHCORDS
CAN BE ROUTED
EITHER UP OR DOWN
CABLE
RETAINERS
CABLE
RETAINERS
26178-A
RED
LATCH
SPOOL
LOCKING
TAB