MAINTENANCE
3.1 TEST EQUIPMENT
The following items are necessary to carry out maintenance of the systems:
A multimeter with small test probes, to measure the various test voltages and to test the continuity
of wiring between the main equipment and stations.
(ii) A programming console commonly called TPU-AN, Test and Programming Unit for AN-61 6
Business System. This is equipped with a programming button which places the unit into
“programme” mode, thus enabling verification and/or reprogramming of site-dependant system
data.
(iii) An AMP-Champ connector insertion tool, which is used to terminate the AMP-Champ connector.
Normal maintenance tools, i.e. Buttinski, Long-nose pliers, Angle Cutters, and both Phillips and flat
blade type screwdrivers.
3.2 TEST POINTS
3.2.1 Power Supply
There are six DC voltages supplied for these systems:
The supply voltages are accessed by pulling out the power supply unit from the main equipment cabinet
and disconnecting the 12-pin power plug from the backplane.
Measure the voltages across the plug pins as shown on table 3.2.1
Figure 3.2.1 shows the pin locations
on the plug.
PIN
NO. WIRE COLOUR
PCB
DESIGNATION
VOLTS REFERENCE
PIN
1
2
3
4
5
6
7
8
9
10
11
12
Brown
Red
Orange
Yellow
Pink
Blue
Purple
Grey
White
Black
Light Blue
LGD
AGD
R20
T20
RGD
T30
TGD
Reset
5.05 0.3 2
0.8 5
7.5 0.8 5
20 1 8
5
36 40 10
Table 3.2.1
DC VOLTAGE TEST POINT SUMMARY
8
Fig. 3.2.1
PIN LOCATIONS
79
AN-61 6
ISSUE