507716-01
Page 23 of 58
Issue 1717
Figure 27.
Figure 28.
Intake Piping
This gas furnace may be installed in either direct vent
or non-direct vent applications. In non-direct vent
applications, when intake air will be drawn into the furnace
from the surrounding space, the indoor air quality must be
considered and guidelines listed in Combustion, Dilution
and Ventilation Air section must be followed.
Follow the next two steps when installing the unit in Direct
Vent applications, where combustion air is taken from
outdoors and flue gases are discharged outdoors. The
provided air intake screen must not be used in direct vent
applications (outdoors).
1. Use transition solvent cement or a sheet metal screw
to secure the intake pipe to the inlet air connector.
2. Route piping to outside of structure. Continue with
installation following instructions given in general
guide lines for piping terminations and in intake and
exhaust piping terminations for direct vent sections.
Refer to Table 5A through Table 5C for pipe sizes.
Содержание GUH95C
Страница 3: ...507716 01 Page 3 of 58 Issue 1717 Figure 1 Parts Arrangement...
Страница 22: ...507716 01 Page 22 of 58 Issue 1717 Figure 25 Figure 26...
Страница 37: ...507716 01 Page 37 of 58 Issue 1717 Figure 59 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC...
Страница 56: ...507716 01 Page 56 of 58 Issue 1717 Start Up Performance Checklist...