INSTALLATION GUIDE FOR RA-5200
RA-5200 QI
Copyright - refer to title page
Page 34
ENU Status : 1-0-0
3.3 INSTALLATION PROCEDURES
3.3.1 GOODS INWARDS INSPECTION
This system was factory tested, inspected, packed, and delivered to the carrier with utmost care. Do
not accept shipment from carrier which shows damage or shortage until the carrier's agent endorses a
statement of the irregularity on the face of the carrier's receipt. Without documentary evidence, a claim
cannot be processed.
Open and check each package against the packing list. For any shortage, contact Comba Telecom
Systems. Do not remove items from packing materials until installation.
3.3.2 TOOLS
See appendix for a full list of tools required for installation and maintenance.
3.3.3 PREPARATION
4
Mounting surface capable of support equipment’ weight: MOU and ROU each at 14kg with RRU
at 47kg
5
Power outlet within 2m
6
Terminate unused antenna/RF cable with 50 ohm terminator
7
Protect unused optical interface with protective cap
8
Earthing point/Safety ground within 2m
Antenna:
•
Antenna installation is covered by their respective manuals. Take normal precautions when
preparing and handling feeder cables to ensure they are not damaged.
Optical Fiber:
•
Fiber optic cables require proper handling. Do not stretch, puncture, or crush the fiber cable(s)
with staples, heavy equipment, doors, etc.
•
Always maintain the minimum bending radius specified by the cable manufacturer. The minimum
bend radius is usually 10 times as the cable's outer diameter. In the case of single optical fiber that
is not in a cable, the minimum bending radius to be observed is 3cm.