![Columbia CT Series Скачать руководство пользователя страница 33](http://html.mh-extra.com/html/columbia/ct-series/ct-series_installation-operation-and-maintenance-manual_2638309033.webp)
FM-148 COLUMBIA BOILER COMPANY, REV 6-06
- 30 -
Millboard top gasket part numbers:
CT-6
332200
CT-10
332210
CT-15
332220
CT-20
332225
CT-25
332230
CT-35
332232
CT-50
332233
Disassembly, Cleaning and Assembly Instructions
1. Obtain a top refractory millboard ring from your local supplier before attempting
to look inside the flue passages.
2. Take off the top jacket by removing the three screws that connect it to itself and
the four screws that connect it to the top cover small mounting angles. Set the top
jacket and the fiberglass insulation strip found behind it to the side.
3. Scribe or mark a line on the outer jacket and top cover to aid in aligning the top
cover during reassembly. This is important to assure that the screw holes will line
up later.
4. Remove the sheet metal screws around the outside of the top cover and save for
reassembly.
5. Remove the upper hand hole assembly if your boiler was manufactured after
February 1991.
6. Lift the top and place as far up and out of the way as possible. The piping and
electrical connections do not have to be disconnected but the top ring will not
come all the way off.
7. Remove the millboard refractory ring.
8. The flue passages should now be visible and can be cleaned as desired. It is sug-
gested that the soot be brushed down to the bottom and vacuumed out by push-
ing a long hose or pipe down between the baffles.
9. Clean the baffle area as desired.
10. Place the new millboard refractory ring in place of the old one and seal between
the sections and any other small openings with a small amount of furnace cement
or high temperature caulk.
11. Place the top jacket back over the millboard making sure to line up the marks
made in Step #3 above.
12. Reinstall the sheet metal screws in the top cover, starting at one side and working
around the boiler. The use of a pry bar is suggested to pull the outer edge down
far enough to line up the holes.
13. Replace the gasket on the hand-hole plate (see previous pages of part number
and instructions), and reinstall the top hand hole assembly.
14. Reinstall the top jacket fiberglass insulation strip. Replace this insulation strip with
a new one if necessary.
15. Reinstall the top jacket and secure it to the top cover and to itself with the seven
(7) screws that were removed.
Содержание CT Series
Страница 2: ...CT BOILER WITH PARTIAL SECTION Figure 1 ...
Страница 13: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 10 Figure 4 BLOWDOWN PIPING ...
Страница 34: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 31 MAINTENANCE LOG ...
Страница 35: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 32 MAINTENANCE LOG ...
Страница 48: ...APPENDICES ...
Страница 58: ......
Страница 60: ...OPERATION OF WARRICK DUAL FUNCTION CONTROLS 5 95 PRINTED IN U S A ...
Страница 61: ...INSTALLATION OF WARRICK SERIES 3C 3K ELECTRODE FITTINGS ...
Страница 62: ......
Страница 63: ...OPERATION OF WARRICK SERIES 26 CONTROLS 5 93 ...
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 71: ......