FM-148 COLUMBIA BOILER COMPANY, REV 6-06
- 7 -
OIL SUPPLY PIPING
Consult the burner section of this manual for oil line type and sizing requirements for prop-
er operation. The size of oil lines is extremely important for proper operation. Suction vac-
uums must be held to acceptable limits.
All oil feed lines must be air tight. Use as few fittings as possible when assembling the oil
lines. The slightest air leak, usually caused by loose fittings or bad gaskets, can cause poor
starts, smoky starts, sooting of burner parts, inefficient operation, and a dangerous com-
bustion condition.
A vacuum test should be done on all installation to ensure that all fittings are tight and the
oil lines are of proper size. Always use flare fittings instead of compression fittings on oil
service lines. Compression fittings allow more of a chance for air to be introduced into the
oil supply.
WARNING: TEFLON
®
TAPE SHOULD NEVER BE USED WITH ANY OIL LINE CONNEC-
TIONS. THE USE OF TEFLON
®
TAPE ON BURNER COMPONENTS OR OIL
SERVICE LINES WILL VOID MOST BURNER WARRANTIES.
For additional information consult the burner section of this manual.
ELECTRICAL SUPPLY
Connect the electric supply to the boiler and condensate return system as shown in the
wiring diagrams. Separate electrical services and disconnects must be provided for both
the boiler and the return system. If both 110 volts AC and 220 volts AC are needed, sep-
arate disconnects should be provided. The wiring must be installed in accordance with the
National Electrical Code and any other state and local codes.
All disconnects should provide overload protection to prevent injury to personnel or dam-
age to equipment.
Be sure that the incoming voltages match that of the appliances before applying power.
Make a special point of checking the internal wiring of the blower motor as most motors
can be wired for either 110 or 220 volts.
FEEDWATER
Connect the feedwater supply from the condensate return tank to the boiler inlet feedwa-
ter connection. See Figure 2 and Piping Layout PL-098 in Appendix. Columbia Boiler
Company provides one spring type check valve in the feedwater piping. An additional
swing type check valve should be installed in the feed line as close to the pump as possi-
ble. These valves should be piped in the horizontal position.
Do not use the pump as a piping support. It is very important that the piping be independ-
ently supported at the pump.
Содержание CT Series
Страница 2: ...CT BOILER WITH PARTIAL SECTION Figure 1 ...
Страница 13: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 10 Figure 4 BLOWDOWN PIPING ...
Страница 34: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 31 MAINTENANCE LOG ...
Страница 35: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 32 MAINTENANCE LOG ...
Страница 48: ...APPENDICES ...
Страница 58: ......
Страница 60: ...OPERATION OF WARRICK DUAL FUNCTION CONTROLS 5 95 PRINTED IN U S A ...
Страница 61: ...INSTALLATION OF WARRICK SERIES 3C 3K ELECTRODE FITTINGS ...
Страница 62: ......
Страница 63: ...OPERATION OF WARRICK SERIES 26 CONTROLS 5 93 ...
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 71: ......