![Columbia CT Series Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/columbia/ct-series/ct-series_installation-operation-and-maintenance-manual_2638309011.webp)
FM-148 COLUMBIA BOILER COMPANY, REV 6-06
- 8 -
FEEDWATER PIPING
Figure 2
Do not fill the boiler
until the installation is complete and you are ready to fire the burner.
Firing the burner will then boil the water which will drive off the dissolved oxygen in the
water and help maintain the proper boiler water chemical balance.
See the WATER TREATMENT section for important information regarding the proper chem-
ical water treatment required to insure satisfactory service life of the boiler.
On long horizontal runs of piping, it is best to maintain the piping as level as possible.
Avoid high spots that will collect air and lead to erratic pumping. Install a check valve to
prevent the boiler water from back feeding into the service water supply.
STEAM PIPING
Figure 3
Содержание CT Series
Страница 2: ...CT BOILER WITH PARTIAL SECTION Figure 1 ...
Страница 13: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 10 Figure 4 BLOWDOWN PIPING ...
Страница 34: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 31 MAINTENANCE LOG ...
Страница 35: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 32 MAINTENANCE LOG ...
Страница 48: ...APPENDICES ...
Страница 58: ......
Страница 60: ...OPERATION OF WARRICK DUAL FUNCTION CONTROLS 5 95 PRINTED IN U S A ...
Страница 61: ...INSTALLATION OF WARRICK SERIES 3C 3K ELECTRODE FITTINGS ...
Страница 62: ......
Страница 63: ...OPERATION OF WARRICK SERIES 26 CONTROLS 5 93 ...
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 71: ......