FM-148 COLUMBIA BOILER COMPANY, REV 6-06
- 11 -
CLEANING AND FILLING A NEW STEAM BOILER
In order to minimize the corrosive effects of raw water oxidation on the boiler, the water
must be heated to at least 180°F immediately after entering the boiler, in order to drive off
the corrosive dissolved gases. This applies to all water - whether from a well, a spring, or
from the local municipal water system.
The oil and grease that accumulate in a new steam boiler can usually be washed out by
boiling as follows:
1. Fill the boiler to the normal waterline.
2. Provide a boil-out compound of caustic soda and trisodium phosphate in the pro-
portions of 2-1/2 lbs. of each chemical per 120 gallons of water.
CAUTION: USE CARE IN HANDLING THESE CHEMICALS. THE CAUSTIC
SODA IS EXTREMELY CORROSIVE TO SKIN AND CLOTHING. DO
NOT PERMIT EITHER THE DRY MATERIAL OR THE CONCENTRATE-
ED SOLUTION TO CONTACT SKIN OR CLOTHING.
3. Mix the chemicals with water and pour into the boiler through any convenient
opening in the boiler.
4. Start the firing equipment.
5. Boil the water for at least five hours.
6. Stop the firing equipment.
7. Drain the boiler to a location where hot water can be discharged safely.
8. Wash the boiler thoroughly using a hose with sufficient pressure.
9. Fill the boiler to the normal waterline.
10. Add boiler water treatment as prescribed by a water treatment specialist.
11. Boil or bring water temperature to at least 180°F immediately.
12. The boiler is ready to put into service or on standby.
EQUAL AMOUNTS
CAUSTIC SODA AND
TRISODIUM PHOSPHATE
CT-6
5 1/3 oz.
CT-10
8 oz.
CT-15
12 oz.
CT-20
1 lb.
CT-25
1 lb. 4 oz.
CT-35
1 lb. 14 oz.
CT-50
4 lbs. 9 oz.
BOILER
MODEL
Содержание CT Series
Страница 2: ...CT BOILER WITH PARTIAL SECTION Figure 1 ...
Страница 13: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 10 Figure 4 BLOWDOWN PIPING ...
Страница 34: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 31 MAINTENANCE LOG ...
Страница 35: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 32 MAINTENANCE LOG ...
Страница 48: ...APPENDICES ...
Страница 58: ......
Страница 60: ...OPERATION OF WARRICK DUAL FUNCTION CONTROLS 5 95 PRINTED IN U S A ...
Страница 61: ...INSTALLATION OF WARRICK SERIES 3C 3K ELECTRODE FITTINGS ...
Страница 62: ......
Страница 63: ...OPERATION OF WARRICK SERIES 26 CONTROLS 5 93 ...
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 71: ......