Page 54
INSTALLATION & USER'S MANUAL CLITE2
15.8.5.4
Start test sequence
This menu starts a test sequence which tests the movement of the lamp housings and focus for
each lamp house one at a time.
The test sequence will perform as follows:
At test sequence startup the lamp housing will be moved to parking position.
The horizontal axis will be rotated one full revolution clockwise.
The vertical axis will be rotated one full revolution clockwise.
The left lamp houses focus motor is activated during 10 seconds.
The right lamp houses focus motor is activated during 10 seconds.
The whole sequence above will be repeated 5 times before the test sequence is automatically
abandoned. Every even time the rotation will be anti-clockwise and every odd time the rotation
will be clockwise. During the test sequence the operator can switch on and off lights by simply
press the button (
2
) and (
5
The
test sequence can’t be abandoned by the operator without switching off the main power in the
electrical box.
Содержание CLITE2
Страница 57: ...INSTALLATION USER S MANUAL CLITE2 Page 57 OP Rotation illustration 270 0 90 180...
Страница 66: ...Page 66 INSTALLATION USER S MANUAL CLITE2 Mechanical drawings 17 2 Operator Panel 17 2 1...
Страница 67: ...INSTALLATION USER S MANUAL CLITE2 Page 67 Electrical box CLITE2 100 240VAC 17 2 2...
Страница 68: ...Page 68 INSTALLATION USER S MANUAL CLITE2 Electrical box CLITE2 24VDC 17 2 3...
Страница 74: ...Page 74 INSTALLATION USER S MANUAL CLITE2 CLITE2IR VIDEO CONNECTION 19...
Страница 86: ...Page 86 INSTALLATION USER S MANUAL CLITE2...
Страница 87: ...INSTALLATION USER S MANUAL CLITE2 Page 87...