WARRANTY CONDITIONS CLITE2
2.
A correctly installed searchlight system from Colorlight requires no planned regular maintenance
or service during the first 10 years in operation.
The “Maintenance and Service plan” describes how to keep the product in good condition.
The warranty is conditioned by below mentioned key points.
Before powering up the unit, make sure that:
Vibration dampers are mounted correctly according to this installation manual.
The mechanical fundament where the searchlight is placed is robust.
Warranty seal on the service hatch is unbroken.
Outgoing cable radius from the searchlight is smooth and not stressed.
All cables used for the installations are as per Colorl
ight’s specifications or as per
separate made agreement.
Signal cables are not placed together with high power cables.
Electrical connections are made according to electrical scheme and wiring diagram.
Length of cables are not exceeding the recommended maximum lengths as stated
below:
Power/signal cables between searchlight and E-box for 100-240VAC-system: Max
30 meter
Power cables between searchlight and E-box for 24 VDC-system: Max 7 meter
Remote cable / Ethernet cable between E-box and remote control: Max 100 meter
(longer distance requires an amplifier or fibre optic version).
E-box (EB) is placed in an non-condense environment with a minimum temperature of
+5 C
(indoor) if not customised for other installation.
The remote panel (OP) is bridge mounted in an IP56 environment. If placed outside it
must be under a protection hood when not in use.
Remote panel is screwed in bridge panel, properly grounded and correct installed.
After above checkpoints are verified the system should be started up as per this manual
to verify the functionalities.
In case of any questions related to the warranty, please contact us at
additional support.
Содержание CLITE2
Страница 57: ...INSTALLATION USER S MANUAL CLITE2 Page 57 OP Rotation illustration 270 0 90 180...
Страница 66: ...Page 66 INSTALLATION USER S MANUAL CLITE2 Mechanical drawings 17 2 Operator Panel 17 2 1...
Страница 67: ...INSTALLATION USER S MANUAL CLITE2 Page 67 Electrical box CLITE2 100 240VAC 17 2 2...
Страница 68: ...Page 68 INSTALLATION USER S MANUAL CLITE2 Electrical box CLITE2 24VDC 17 2 3...
Страница 74: ...Page 74 INSTALLATION USER S MANUAL CLITE2 CLITE2IR VIDEO CONNECTION 19...
Страница 86: ...Page 86 INSTALLATION USER S MANUAL CLITE2...
Страница 87: ...INSTALLATION USER S MANUAL CLITE2 Page 87...