Page | 9
Verve LED
Now, the machine is unpacked and ready for installation process.
Fig 2: Unpacking the Machine
Caution:
Don’t
move or unload the machine before ensuring that the place where the machine is landed, is even
or level.
Precautions:
•
Don’t lift from the extreme ends of the machine
•
Don’t tilt the machine
•
Don’t drop the machine
•
Don’t climb or stack anything over the roof
8. Input Power Checklist
The input power checklist is given as below:
L
–
N
220 V
L
–
E
218V
N
–
E
2V
Содержание VerveLED VLR 2513
Страница 1: ......
Страница 49: ...Page 48 Verve LED...