20
Attaching the Blast Hose to the E-CO
2
150
There are three connections to be made when attaching the blast hose. The large blast hose and
two small signal hoses with quick connect fittings. The large hose has a twist claw type fitting. Line
up the ‘feet’ with the cut outs and twist – making sure the anti-rotation pin locks in place. This is
important to ensure the hose does not come separated during use. The quick connect fittings can
now be connected at the control plate. (figure 9) Lastly the washer can be inserted and the nozzle
can be screwed into the nozzle adapter at end of the blast hose.
Figure 9:
Blast Hose Connection
Blast Hose Connection
When connecting the blast hose to the metering valve, rotate the hose fitting clockwise until the
safety pin locks into place. Be sure thet the safety pin is locked by trying to twist the fitting counter-
clockwise to remove. The fitting should remain in place. To remove the blast hose lift the safety pin
and rotate counter-clockwise.
Figure 10:
Mixed Media
Metering Valve
Safety Pin
Blast Hose
Safety Pin
Содержание E-CO2 150
Страница 1: ...Original Instructions English January 2020 Dry Ice Blasting Abrasive E CO2 150 Operator Manual...
Страница 4: ......
Страница 23: ...19 Aero C100 Connections Figure 7 Aero C100 Connections Aero 80FP Connections Figure 8 Aero 80FP Connections...
Страница 37: ...33 Technical Schematics Pneumatic Schematics 34 39...
Страница 38: ...34...
Страница 39: ...35 C100 E CO2 150 Schematic...
Страница 40: ...36...
Страница 41: ...37 Aero 80FP E CO2 150 Schematic...
Страница 42: ...38...
Страница 43: ...39 PLT 60 E CO2 150 Schematic...
Страница 44: ......