15
1 remove the unit supply flange closing.
2 approach the unit to the Gas Module.
3 match the supply flanges by means of the supplied terminals.
4 tighten screws
5 guarantee the absence of air bypass.
A. Apply the flat adhesive gasket15x5 on the Gas Module flange perimeter to guarantee the absence
of air bypass.
B.
Fix with screws the flue supporting bracket to the GM frontal panel
C.
Fix the extensions with clamps to the flue supporting bracket
D. Fix the suction terminals in ambient and the fuel components (curves, extensions, terminals) by the
corresponding gaskets
Содержание CSRN-XHE2 Series
Страница 1: ...CSRN XHE2 49 4 110 4 R 410A M07V40B13 07 11 20 MANUAL FOR INSTALLATION USE AND MAINTENANCE...
Страница 75: ...Dimensional drawings 75...
Страница 77: ...Dimensional drawings 77...
Страница 79: ...Dimensional drawings 79...
Страница 81: ...Dimensional drawings 81...
Страница 83: ...Dimensional drawings 83...
Страница 85: ...Dimensional drawings 85...
Страница 87: ...Dimensional drawings 87...
Страница 89: ...Dimensional drawings 89...
Страница 91: ...Dimensional drawings 91...