ZEFNET Pro User Manual
21
WIRING INSTRUCTIONS
Remove the front panel. Pull the power conductors into the bottom of the
enclosure and pull up through into the 3-R rated junction box or service
entrance rated enclosure (depending on specific options chosen at time of
ordered) already mounted in the ZEFNET Pro. See the diagram below for
the Service Entrance Rated Enclosure:
Before connecting the HCS service conductors, please carefully read the
section of this manual titled Installation - Service Connections. If unsure of
the type of power provided at the service panel, please consult with the
local utility or call a Service Representative for assistance.
Service conductors landing in the ZEFNET Pro enclosure should be 90ºC
rated. The wiring gauge should be suitable given the ZEFNET Pro model,
and normal rules around NEC derating over the length of conductor run
back to the main panel in the building, or service equipment.