ZEFNET Pro User Manual
23
MOVING & STORAGE INSTRUCTIONS
NOTE:
The ZEFNET Pro is intended for fixed installations. For mounting
requirements, consult the
Mounting Procedures
section of the
Installation Instructions
in this manual.
Always turn off input power to the EVSE at the circuit breaker panel prior to
hard-wiring an ZEFNET Pro to or disconnecting an ZEFNET Pro from the
service lines. Likewise, always turn off input power to the EVSE at the
circuit breaker panel prior to opening the front or rear panels of the
ZEFNET Pro.
When transporting the EVSE, do not lift or carry the entire unit by the
charge cables. Likewise, do not use the Credit Card Reader or Cellular
Antennas as lifting points when moving the ZEFNET Pro.
The EVSE has a non-operational storage temperature range of -40°C to
+80°C (-40°F to +176°F).