Page 6
Ultra Classic (VT) Series
Condensate Drain
Each unit utilizes a condensate hose inside the cabinet as
a trapping loop, therefore an external trap is not necessary.
Figure 5 shows typical condensate connections.
Each unit must be installed with means to flush or
blowout the condensate drain line. Do not install units
with a common trap and/or vent.
Install a vent in the condensate line of any application
which may allow dirt or air to collect in the line. Always
vent when the application requires a long, horizontal
����������
���������
����������
����
������
��������
�������������
������������
�����
������
�������������
To make the connection to a ground loop system, mate
the brass loop connection against the rubber gasket in
the swivel connector, and thread the female locking
ring onto the pipe threads, while maintaining the brass
connector in the desired direction (see Figure 2). Tighten
the connectors by hand to provide a leak proof joint.
When connecting to an open loop (ground water) system,
thread any 1" MPT fitting (PVC or copper) into the swivel
connector and tighten in the same manner as noted above.
The open and closed loop piping system must include
pressure/temperature taps for serviceability.
run. When some sagging in the condensate line may be
anticipated (as in a long line of plastic pipe) or when
“double trapping” may occur. Also vent when large units
are working against higher external static pressure that
other units connected to the same condensate main since
this may cause poor drainage for all units on the line.
Figure 4: Well Piping using a individual connections
Figure 5: Typical drain connection
Figure 3: Loop Piping using a manifold
P/T Plugs
Optional
Accessory
Manifold
Flexible canvas duct
connector to reduce
noise and vibration
Use turning vanes in
supply transition
Internally insulate supply
duct for first 4’ each way
to reduce noise
Internally insulate return
transition duct to reduce
noise
Rounded return
transition
Rev.: 11/2/00
Flexible canvas duct
connector to reduce
noise and vibration
Use turning vanes in
supply transition
Internally insulate supply
duct for first 4’ [1.2m] each
way to reduce noise
Internally insulate return
transition duct to reduce
noise
Rounded return
transition
Rev 3/27/00
INSTALLATION
Figure 2: The Female Locking Ring is threaded onto
the pipe threads which holds the male pipe end against
the gasket, and seals the joint. HAND TIGHTEN
ONLY! DO NOT OVERTIGHTEN!
Содержание Ultra Classic VT 036
Страница 4: ...Page Ultra Classic VT Series Physical Dimensions INSTALLATION...
Страница 18: ...Page 18 Ultra Classic VT Series Electrical Schematic...
Страница 29: ...Ultra Classic VT Series Page 29 Notes...
Страница 30: ...Page 30 Ultra Classic VT Series...