MAINTENANCE
42
Tennant T300 (02- 2016)
4. Fill in the installation date on the new cartridge
label (Figure 129).
FIG. 129
5. Install the new cartridge and reconnect the two
hoses. Make sure the hose connectors are fully
inserted into the cartridge.
6. Reset timer for new cartridge.
Carefully read and understand all steps first before
performing procedure.
a. Turn key on.
b. Press and hold the service switch, located on
the ec-H2O module, for 10 seconds. After
releasing service switch, the three solution flow
indicator lights will begin to (ripple) move back
and forth (Figure 130).
c. Within 5 seconds after releasing the service
switch, while the three indicator lights are
moving back and forth, quickly press and
release the solution flow button located on
ec-H2O module (Figure 130).
The three indicator lights will then blink three
times to indicate timer has been reset.
Repeat process if the three indicator lights do
not blink three times.
Service switch
3 indicator lights
Solution flow button
FIG. 130
LOADING/UNLOADING MACHINE FOR
TRANSPORTING
When transporting the machine by use of trailer or
truck, carefully follow the loading and tie-down
procedure:
1. Raise the scrub head and remove squeegee
assembly.
2. Use a ramp that can support the machine weight
and operator and carefully load machine. Do not
operate the machine on a ramp incline that
exceeds a 21% grade level (Figure 131). A winch
must be used when ramp incline exceeds a 21%
grade level.
FOR SAFETY: When loading/unloading machine
onto/off truck or trailer, use a ramp that can
support the machine weight and operator.
FOR SAFETY: Do not operate the machine on a
ramp incline that exceeds a 21% grade level.
FIG. 131
3. Once loaded, position the front of the machine up
against the front of the trailer or truck. Lower the
scrub head, turn key off and set parking brake, if
equipped (Figure 132).
4. Place a block behind each wheel (Figure 132).
5. Using tie-down straps, secure the machine using the
four tie-down brackets located on the machine frame
(Figure 132). It may be necessary to install tie-down
brackets to the floor of your trailer or truck.
NOTE:
When transporting machine in an open truck or
trailer, secure recovery tank lid.
ATTENTION: Do not use control console area
or accessory storage rails for tie-down
locations, damage may occur.
FIG. 132