
27
Revision date: 07.11.14
Attach U-Channel (111613Z144) to End Rafters
Ribbon Board
111613Z144 Aluminum
U-Channel
111613Z144
Aluminum
Channel
attached to
the top of
each end
rafter flush to
the outside
edge of the
rafter.
Optional Poly Carbonate
End Wall Cladding with
End Wall Frame
INSTALL U-CHANNEL
Buildings with film (or 5.2 oz) covers require double u-channel attached to end rafters to secure cover.
Photos show a
building with an optional end wall and roll-up panel. Additional purchase required.
If your building does not include a
ridge vent, complete the steps on this page.
See next page if your building includes a ridge vent.
Secure the 111613Z144 u-channel to top of both end rafters using FA4482 Tek screws spaced at 16" on-center. Install
flush with the outer edge of end rafter.
See comments below for details about position of channel on end rafter.
After installation, continue with the Frame Check steps at the bottom of the next page.
111613Z144
U-Channel
for cover
installation.