All points in this form must be completed on the commissioning of a new Claydon machine with the
end user. This form along with a filled in Warranty Card (located in the instruction manual) must be, fully
completed, signed by the customer and returned to: The Service Department, Claydon Yield-O-Meter
Ltd, Gaines Hall, Wickhambrook, Newmarket, Suffolk, CB8 8YA within 7 days of the commissioning of the
machine for Warranty to be valid. It is the customer’s responsibility to return these forms.
CUSTOMER NAME
MACHINE SERIAL NUMBER
COUNTY
COUNTY
POST CODE
ADDRESS
TELEPHONE NUMBER
DATE OF COMMISSIONING
I ...................................................(Representative Name)
have on behalf of ..............................................................
(Dealer Name) commissioned the machine above
to the best of my ability and have covered all the
points in this check as a minimum.
Signed.......................................................................
Date
I …………………………………………(end user
name) have received the commissioning of my
machine from a qualified Claydon representative
and am happy with the competence of the
representative and the level of service I have
received. All the details on this form are correct to
the best of my knowledge.
Signed.......................................................................
Date
DD/MM/YYYY
TASK
COMPLETED
The customer (and any operator of the machine) has been issued with and read the operators manual.
Customer is aware of all transport locks on the machine and knows how to operate them correctly.
The customer’s tractor has 1 inch ‘free flow return’ for any hydraulic motor return lines. Fan speed has been correctly set.
The customer has fitted the drill’s electrical power cable (Red and Black Cable) which is required to be connected directly to the
battery.
The customer understands how to set marker arms on the machine correctly and adjust marker tine.
The customer understands how to correctly change the coulters and coulter boots.
The customer understands how to adjust the metering unit(s) on the machine to achieve the correct setting.
The customer knows how to fill and empty the hopper.
The customer understands the drill control system: Artemis/Vari-Speed/Wizard.
The customer understands how to calibrate the machine, and any other applicators fitted to the machine.
The customer understands how to set the machine level (front to rear).
The customer understands how to set the machine level (left to right).
The customer understands how to check the depth of the seed and make necessary adjustments.
The customer understands how to set and adjust the rear tool bar(s).
The customer understands how to adjust and set the pre emergence markers (if fitted).
The customer knows all the lubrication/maintenance points on the machine.
DD
MM YYYY
DD
MM YYYY
WARRANTY COMMISSIONING
CHECK SHEET &
CONFORMATION FORM
Содержание HYBRID MOUNTED
Страница 4: ...4 OPERATORS MANUAL HYBRID MOUNTED ...
Страница 6: ...A INTRODUCTION 6 OPERATORS MANUAL HYBRID MOUNTED ...
Страница 12: ...C DIRECTIVE PROVISIONS 12 OPERATORS MANUAL HYBRID MOUNTED ...
Страница 34: ...E IN FIELD OPERATION 34 OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 3M ...
Страница 35: ...35 E IN FIELD OPERATION OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 4M ...
Страница 36: ...E IN FIELD OPERATION 36 OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 4 8M ...
Страница 37: ...37 E IN FIELD OPERATION OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 6M ...
Страница 45: ...45 G DECLARATION OF CONFORMITY OPERATORS MANUAL HYBRID MOUNTED ...
Страница 49: ......
Страница 51: ......