15
D
PRE-WORK PREPARATION
OPERATORS MANUAL - HYBRID MOUNTED
The Claydon Drill can be mounted onto any CATIIIN or CATIVN compatible three point linkage with the
linkage pins supplied and CATIII balls (not supplied).
Once the drill is attached and at the correct working depth, the top link should be set at an angle in which
the convergence point between the upper and lower link arms should fall at the front axle (Figure 5). This
can be achieved by altering the top link pin attachment points on the tractor and drill. This ensures stability
and the mass of the implement is used correctly.
Connecting the Drill to the Tractor
1. ISOCAN control unit
2. Screen communication cable to RDS box
3. Electrical power cables to tractor battery terminals
1
2
3
ELECTRICAL CONNECTIONS
Mount the RDS ISOCAN Control Unit in a position in the cab easily visible and reachable from the driving
position.
Connect the main power cable supplied with the RDS ISOCAN Control Unit directly to the battery
terminals on the tractor. Run the screen communication cable to the tractor cab by a safe route so that it
can’t be caught or snagged.
1.
Upper link point
2.
Upper hitch point
3.
Lower link point
4.
Lower hitch point
5.
Vertical virtual hitch point
Содержание HYBRID MOUNTED
Страница 4: ...4 OPERATORS MANUAL HYBRID MOUNTED ...
Страница 6: ...A INTRODUCTION 6 OPERATORS MANUAL HYBRID MOUNTED ...
Страница 12: ...C DIRECTIVE PROVISIONS 12 OPERATORS MANUAL HYBRID MOUNTED ...
Страница 34: ...E IN FIELD OPERATION 34 OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 3M ...
Страница 35: ...35 E IN FIELD OPERATION OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 4M ...
Страница 36: ...E IN FIELD OPERATION 36 OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 4 8M ...
Страница 37: ...37 E IN FIELD OPERATION OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 6M ...
Страница 45: ...45 G DECLARATION OF CONFORMITY OPERATORS MANUAL HYBRID MOUNTED ...
Страница 49: ......
Страница 51: ......