D
PRE-WORK PREPARATION
18
OPERATORS MANUAL - HYBRID MOUNTED
Access to the hopper for loading seed and fert is by means of the ladder onto the hopper access platform.
Pre-work Preparation
ACCESSING THE HOPPER
Fold down the ladder as shown in the photos above.
Open the hopper cover as shown in the photos above.
OPENING THE HOPPER
ENSURE THE LADDER IS FOLDED UP WHEN THE DRILL IS WORKING
!
ENSURE THE HOPPER COVER IS CLOSED WHEN THE DRILL IS WORKING
!
Содержание HYBRID MOUNTED
Страница 4: ...4 OPERATORS MANUAL HYBRID MOUNTED ...
Страница 6: ...A INTRODUCTION 6 OPERATORS MANUAL HYBRID MOUNTED ...
Страница 12: ...C DIRECTIVE PROVISIONS 12 OPERATORS MANUAL HYBRID MOUNTED ...
Страница 34: ...E IN FIELD OPERATION 34 OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 3M ...
Страница 35: ...35 E IN FIELD OPERATION OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 4M ...
Страница 36: ...E IN FIELD OPERATION 36 OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 4 8M ...
Страница 37: ...37 E IN FIELD OPERATION OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 6M ...
Страница 45: ...45 G DECLARATION OF CONFORMITY OPERATORS MANUAL HYBRID MOUNTED ...
Страница 49: ......
Страница 51: ......