13
Instruction Manual
RGU-100B
3�5�2� INSTALLATION ON A DIN RAIL
For installation on a DIN rail, a support bracket is provided with the device, see
Figure 6: Support bracket�
The steps to ensure proper installation are:
1�-
Attach the bracket to the DIN rail. Be sure the side marked FRONT is visible. The bracket can be in-
stalled in 2 ways, depending on how the
WGB
.
2�-
Mount the
WGB
on the bracket,
Figure 7: Installation on a DIN rail�
Содержание RGU-100B
Страница 1: ...INSTRUCTION MANUAL Protection and monitoring relay RGU 100B M256B01 03 20A...
Страница 2: ...2 RGU 100B Instruction Manual...
Страница 47: ...47 Instruction Manual RGU 100B 11 CE CERTIFICATE...
Страница 48: ...48 RGU 100B Instruction Manual...
Страница 49: ...49 Instruction Manual RGU 100B...
Страница 53: ...53 Instruction Manual RGU 100B...