28
Raption 150 Series Installation Manual
C
Foundation kit
Foundation rod
435 mm x M16
16x
4x
Nuts M16
Template for
Dispenser
The purpose of this chapter is the technical definition and basic requirements for
implement the base and fixing the Charge Point.
•
The unit can be installed both, inside and outside.
•
Two foundation kits with a mounting templates is provided to ensure the distances
between the foundation bolts.
Washers M16
1x
1x
16x
Foundation rod
350 mm x M10
16x
4x
Nuts M10
Washers M10
16x
Template for
Power Cabinet
Содержание Raption 150 Series
Страница 1: ...Installation Manual Raption 150 Series ...
Страница 2: ......
Страница 4: ......
Страница 7: ...03 ...
Страница 20: ...16 Raption 150 Series Installation Manual Power Unit front door Power input supply ...
Страница 21: ...17 Power Unit rear door Output wiring to Dispenser ...
Страница 27: ...23 1 2 3 4 ...
Страница 34: ...30 Raption 150 Series Installation Manual E Dispenser template dimensions 435 300 70 ...
Страница 35: ...31 400 165 280 310 ...
Страница 37: ...33 0 1920 ...
Страница 40: ...36 Raption 150 Series Installation Manual H Power Unit template dimensions 250 350 50 50 850 714 ...
Страница 42: ...38 Raption 150 Series Installation Manual Concrete basement dimensions for Power Unit J 0 2100 ...
Страница 51: ...47 CCS CCS CHA CHA 3 ...
Страница 53: ...49 PE DC 2 L N PE ETHERNET CABLE 2 1 3 DC 1 2 2 Wiring connection for the Dispenser Scheme ...
Страница 55: ...51 L1 N PE ETHERNET 1 2 ...
Страница 56: ...52 Raption 150 Series Installation Manual CCS CCS 3 ...
Страница 57: ...53 CHA PE CHA 3 ...
Страница 59: ...55 ...
Страница 65: ...61 ...
Страница 66: ...62 Raption 150 Series Installation Manual 8 ...