07
1 — I N P U T P O W E R S U P P LY
The input power supply line for the Charge Point, must be hardwired from a
distribution board to the Charge Point with an individual dedicated circuit. It
has to be done under electrical safety regulations according to your country.
2 — P O W E R S U P P LY L I N E D I M E N S I O N I N G
The dimensioning of the input power supply line of the Charge Point must be
checked by a qualified electrician. Note that various factors, such as, cable
length between distribution board and the Charge Point; maximum input
current of the Charge Point; the installation way, may have influence of the
selected cable.
In such cases, increasing the cable cross-section can be
necessary. The installation company will be responsible for dimensioning
the wires cross section and the electrical protections,
taking into account the
conditions above.
3 — M A X I M U M P O W E R O U T P U T
Depending on the input power line, you can carry out the charging sessions to
the electric vehicle with different power output level, it is possible to limit the
maximum output power by software limitation so as not to exceed the available
input power.
In order to implement this limitation by software, please, refer to the Instruction
Manual.
Note:
In the Chapter 4, subsection E, you are going to find more electrical
instructions so as to implement a secure POWER SUPPLY LINE.
Take into consideration this section before start wiring
connections of the charge point.
Before the installation
B
Electrical wiring considerations
Содержание Raption 150 Series
Страница 1: ...Installation Manual Raption 150 Series ...
Страница 2: ......
Страница 4: ......
Страница 7: ...03 ...
Страница 20: ...16 Raption 150 Series Installation Manual Power Unit front door Power input supply ...
Страница 21: ...17 Power Unit rear door Output wiring to Dispenser ...
Страница 27: ...23 1 2 3 4 ...
Страница 34: ...30 Raption 150 Series Installation Manual E Dispenser template dimensions 435 300 70 ...
Страница 35: ...31 400 165 280 310 ...
Страница 37: ...33 0 1920 ...
Страница 40: ...36 Raption 150 Series Installation Manual H Power Unit template dimensions 250 350 50 50 850 714 ...
Страница 42: ...38 Raption 150 Series Installation Manual Concrete basement dimensions for Power Unit J 0 2100 ...
Страница 51: ...47 CCS CCS CHA CHA 3 ...
Страница 53: ...49 PE DC 2 L N PE ETHERNET CABLE 2 1 3 DC 1 2 2 Wiring connection for the Dispenser Scheme ...
Страница 55: ...51 L1 N PE ETHERNET 1 2 ...
Страница 56: ...52 Raption 150 Series Installation Manual CCS CCS 3 ...
Страница 57: ...53 CHA PE CHA 3 ...
Страница 59: ...55 ...
Страница 65: ...61 ...
Страница 66: ...62 Raption 150 Series Installation Manual 8 ...