![Cima New Plus Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/cima/new-plus/new-plus_maintenance-instruction_2607115051.webp)
Rev.00 - Jan. 2013
43
New Plus
42-45-50-55
5a6. Complete the filling with water and close the lid of the secondary filler (BS).
5a7. Close the cock (P12) (lever on “
c
”).
5a8. Put the thee-way faucet (P6) in work position (the lever on “
A
”).
5b.
FILLING WITH MEDICINAL MIXTURES OR LIQUID PRODUCTS
5b1. Pour the medicinal mixture envisaged for every loading (together with the water possibly used for
the washing of product canisters and of the tools used in the preparation) into the main filler (BP).
5b2. Close the main filler (BP) of the tank.
5b3. Engage the drive outlet (PTO) and take it to a speed of at least 500 RPM
5b4. Complete the filling with water and close the lid of the secondary filler (BS)
6. Move to the treatment place, keeping the Power Takeoff running rate at a minimum value of 500
RPM during all the way.
IN THE TREATMENT AREA:
7. Disengage the drive outlet (PTO) and rest the sprayer on the ground.
Stop the tractor and remove the key from the control panel.
8. Ensure that the fan is stopped. Engage the fan to the servo amplifier as indicated at point 8.1, then
re-close the mobile protection cover.
Tighten the protection-securing screw properly.
9. Start the tractor.
10. Lift the unit. Engage the Power Takeoff and set it up to a running rate of at
least 500 RPM
, in order
to carry out a further agitation.
540
Use ONLY the PTO at 540 rpm. Engage the PTO with the engine of the tractor at
low speed and with maximum modularity, obtaining soft and progressive graft
and avoiding abrupt starts of the cardan shaft.
12. Regulate the operating pressure, by acting on the pressure regulator (P5) (or electric E5) with the
distributor electric (E9), or manual (P9), open (DISTRIBUTION).
13. CARRY OUT THE TREATMENT (See the paragraph 10.3).
8.3 FILLING WITH THE SPECIFIC PIPE
(optional device)
USE ONLY IF CONCURRED FROM THE LAWS OF THE COUNTRY WHERE THE SPRAYER
IS USED. Before utilisation, check the operation and proper sealing of the bottom-drawing
valve by pouring water in the piping.
THE PUMP MUST NEVER RUN DRY.
EXECUTION:
1. Disengage the fan, see point 8.1.a.
2. Close the 2-way distributor:
a. if electrical, position the latch switches (E10) on “
OFF
”.
b. if manual (P9), set the levers in the horizontal position;
3
.
Check that:
- P6: is on working position (lever on “
A
”);
- P12: is closed (lever on “
c
”);
- P5, pressure regulator: is completely open for the unit’s first use, or on the already selected
position for the outstanding treatment or for the previous one..
Содержание New Plus
Страница 1: ...Operationandmaintenanceinstructions New Plus...
Страница 4: ......
Страница 83: ...Rev 00 Jan 2013 75 New Plus 42 45 50 55 Wiring diagram upper cannons delivery control panel 01670_3...
Страница 88: ...New Plus 42 45 50 55 Appunti...
Страница 89: ...New Plus 42 45 50 55 Appunti...
Страница 90: ...New Plus 42 45 50 55 Appunti...
Страница 96: ...Loc Molino Quaroni n 7 Mont Beccaria PV ITALY Tel 39 0385 246636 www cima it...