![Cima New Plus Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/cima/new-plus/new-plus_maintenance-instruction_2607115042.webp)
Rev.00 - Jan. 2013
34
New Plus
42-45-50-55
5.3 INSTALLATION OF REMOTE CONTROLS
5.3.1 Electrical control panel - E10
1. Fix the fastening bracket near to the driver (if not already available on the tractor).
2. Insert the bayonet support of the control panel in the securing clamp and position it so that the
controls are fully visible and accessible during use.
3. Connect the distribution piping (T5) to the hydraulic circuit of the distribution device (head) mounted
on the machine (follow the instructions of the specific “use and maintenance” booklet which is sup
-
plied with it).
4. Connect the feeding pipe (T4) with the electrical distributor (E9).
5. Connect the power supply cable “W1” plugging it in the socket of the tractor..
Position the electrical cables W1 and W2 in such a way as to avoid risking their being
wrenched off during treatments. If necessary, use some securing clamps. A sudden
interruption of power will lock the 2 electrovalves of the electrovalves assembly “E9”.
Should this fault take place when they are in the open position, it is necessary to:
- Stop the tractor and remove the key from the control panel.
-
Position the cock (P6) to “D”.
-
Restore the electric current.
IN CASE OF A PIPE BURST:
1. Stop the tractor and remove the key from the control panel.
2. Close the electrovalves (E9), the switches on the control panel (E10) must be on OFF.
3. Place the lever of the 3-way tap (P6) in position “d”.
4. Replace the broken pipe (for the elimination of these parts, please follow the current regulations).
ELECTRICAL
CONTROL
PANEL
TO THE TRACTOR’S
SERVICE SOCKET
MOUNTING
BRACKET
01671
TO THE
ELECTROVALVES ASSEMBLY (E9)
00086
E9
E10
W2
W1
ELECTROVALVES
ASSEMBLY (E9)
Содержание New Plus
Страница 1: ...Operationandmaintenanceinstructions New Plus...
Страница 4: ......
Страница 83: ...Rev 00 Jan 2013 75 New Plus 42 45 50 55 Wiring diagram upper cannons delivery control panel 01670_3...
Страница 88: ...New Plus 42 45 50 55 Appunti...
Страница 89: ...New Plus 42 45 50 55 Appunti...
Страница 90: ...New Plus 42 45 50 55 Appunti...
Страница 96: ...Loc Molino Quaroni n 7 Mont Beccaria PV ITALY Tel 39 0385 246636 www cima it...