CIAS Elettronica S.r.l.
Ed. 1.5
Installation Handbook
page
44
of
66
CORAL-PLUS
7° Example
(Change of slope in steps, not aligned working planes)
Barrier 1 is located on a different working plane than barrier 2.
In this case, since the change of slope is a step, you must install two separate barriers and
consider two different working planes, always protecting dead zones resulting between Rx1 and
Rx2 with two additional sensors.
8° Example
(Strong dip in the ground)
The strong dip in the ground creates a considerable dead zone that has be protected with an
additional sensor.
Содержание CORAL-PLUS
Страница 70: ...NOTE...
Страница 71: ...NOTE...