3. To install the option card(s), repeat these steps in reverse order.
Related information
Filtration (on page 18)
Replacing the primary environmental board
Estimated replacement time: 12 minutes
1. Remove the front top lid.
2. Remove the light engine lid.
3. Remove the fan pack assembly.
4. Disconnect the five harnesses from the environmental board (EVB).
5. Loosen the captive thumbscrew securing the EVB in place.
6. Remove the EVB.
7. To install the primary EVB, repeat these steps in reverse order.
Replacing the secondary environmental board
Estimated replacement time: 8 minutes
1. Remove the front top lid (on page 40).
2. Remove the light engine lid (on page 41).
3. Disconnect the nine harnesses from the secondary environmental board (EVB2).
4. Loosen the thumbscrew securing the secondary EVB2 in place.
Parts and module replacement
Roadie 4K35 and 4K45 Service Manual
71
020-101694-03 Rev. 1 (01-2016)
Copyright
©
2016 Christie Digital Systems USA Inc. All rights reserved.