Remote Power Supply Rack Shelf safety warnings

To prevent personal injury and to protect the device from damage, read and follow these safety

precautions.

Warning! If not avoided, the following could result in death or serious injury.

This product must be installed within a restricted access location not accessible by the general
public.

SHOCK HAZARD! Disconnect the product from AC before installing, moving, servicing, cleaning,
removing components, or opening any enclosure.

A minimum of two people or appropriately rated lift equipment is required to safely lift, install,
or move the product.

A certified electrician must be present during installation to ensure the installation meets the
local electrical code.

Install the product near an easily accessible AC receptacle.

Hazardous voltages are present at power system inputs. The DC output, though not dangerous
in voltage, has a high short-circuit current capacity that may cause severe burns and electrical
arcing.

SHOCK HAZARD! Power supply uses double pole/neutral fusing. Disconnect all power sources
before opening the product.

Fuses are present in active and neutral lines of the Remote Power Supply Rack Shelf.
F1—Rated 15 A, 250 VAC
F2—Rated 15 A, 250 VAC

Before working with live power systems, remove all metallic jewelry (such as watches, rings,
metal rimmed glasses, or necklaces) and wear safety glasses with side shields at all times during
the installation.

Motors and fans may start without warning.

Use insulated hand tools while working on live power systems.

Terminology

Learn about the components of the LED display system.

Term

Definition

Tile

A cabinet that contains several LED modules.

Array

A group of connected tiles that form a larger display.

Controller

Controls the LED display system array and video input source. Sometimes referred to as
the control unit.

Pixel

A group of one red, one green, and one blue dot.

Subpixel

A pixel is comprised of three subpixels, one for each color: red, green, and blue. Each
subpixel in LED display technology is an LED chip.

Pixel pitch

Specifies the distance from the center of one pixel to the center of the next pixel.

SMD package size

A technical supplier specification related to the pixel size, and denotes the size of the
surface-mounted diode (SMD) itself.

Product overview

Velvet LED Display System Installation and Setup Guide–CorePlus Series (Remote Power)

7

020-102423-01 Rev. 1 (06-2018)

Copyright 

©

 2018 Christie Digital Systems USA, Inc. All rights reserved.

Содержание LED012-CP-R

Страница 1: ...Installation and Setup Guide 020 102423 01 Velvet LED Display System CorePlus Series Remote Power ...

Страница 2: ...e the product is designed for outdoor use problems or damage caused by use of the product outdoors unless such product is protected from precipitation or other adverse weather or environmental conditions and the ambient temperature is within the recommended ambient temperature set forth in the specifications for such product g Defects caused by normal wear and tear or otherwise due to normal aging...

Страница 3: ... spacing between tiles 22 Connecting the data source cables 23 Connecting the power cables 24 Reinstalling the LED modules 24 Installing and configuring the Remote Power Supply Rack Shelf 25 Mounting the Remote Power Supply Rack Shelf 25 Inserting the power modules into the Remote Power Supply Rack Shelf 25 Connecting the LED tile power cables to the Remote Power Supply Rack Shelf 25 Logging in to...

Страница 4: ...the firmware on the E500 controller 33 Configuring the E600 controller 35 Installing Accessing the E600 controller software 35 Logging into the controller software 35 Adjusting the initial picture coordinates 35 Testing the communication between the controller and tiles 36 Reviewing the tile configuration 36 Setting the input resolution 37 Locking and unlocking the controller 37 Upgrading the firm...

Страница 5: ...erious injury Observe all electrostatic precautions Use a grounded wrist strap and insulated tools when handling servicing or cleaning electronic assemblies A minimum of two people or appropriately rated lift equipment is required to safely lift install or move the product A certified electrician must be present during installation to ensure the installation meets the local electrical code Motors ...

Страница 6: ...by using an industrial plug pluggable type B or be provided by a permanent connection A 13 20 A double pole mains circuit breaker certified for the applicable local regulations is required It must be part of the building installation and easily accessible Do not use a wall breaker greater than 20 A This could result in severe damage to the tile system in the event of a failure Caution If not avoid...

Страница 7: ...f the Remote Power Supply Rack Shelf F1 Rated 15 A 250 VAC F2 Rated 15 A 250 VAC Before working with live power systems remove all metallic jewelry such as watches rings metal rimmed glasses or necklaces and wear safety glasses with side shields at all times during the installation Motors and fans may start without warning Use insulated hand tools while working on live power systems Terminology Le...

Страница 8: ...elvet CorePlus Remote Power LED Display System is available in the following documents CorePlus Remote Power Product Safety Guide P N 020 102591 XX CorePlus Remote Power Specifications Guide P N 020 102802 XX E500 User Guide P N 020 102222 XX E600 User Guide P N 020 102717 XX E500 LED Display Controller Serial Commands Technical Reference P N 020 102458 XX Required tools Make sure the following to...

Страница 9: ...as Christie accessories or that you create a custom cable using the Christie Main Power Cable Spool P N 154 122106 XX Connector Kit P N 154 125109 XX and Molex Crimping Tool P N 154 124108 XX For more information on the Molex Crimping Tool see the Molex documentation Typical LED solution A typical LED display system installation contains a variety of components A Media sources Product overview Vel...

Страница 10: ...isplay system offers considerable flexibility in terms of the number of media sources that can be displayed and the overall resolution Color and brightness matching as well as other functions may be performed across an entire array The video source connections between the cabinets are represented by the blue line The power connections between the cabinets are represented by the red line Product ov...

Страница 11: ...es on page 23 Connecting the power cables on page 24 Product overview Velvet LED Display System Installation and Setup Guide CorePlus Series Remote Power 11 020 102423 01 Rev 1 06 2018 Copyright 2018 Christie Digital Systems USA Inc All rights reserved ...

Страница 12: ...00 controller Tile Pixel pitch 2K array size 4K array size 8K array size Maximum number of tiles per controller LED012 CP R 1 2 mm 10 x 5 20 x 10 50 LED014 CP R 1 4 mm 6 x 3 12 x 6 24 x 12 72 LED019 CP R 1 9 mm 8 x 4 16 x 8 32 x 16 128 LED024 CP R 2 4 mm 10 x 5 20 x 10 40 x 20 200 E500 controller interface and ports Learn about the interface and physical ports on the E500 controller Front A Power ...

Страница 13: ...acity of one channel is up to 1920 x 1080 at 60hz Of the two output channels one is primary and the other is secondary Supports low latency The maximum transmission distance of coaxial cable is 100m RJ45 Qty 4 4 channel Gigabit Ethernet interface with each channel supporting up to 1G bandwidth Total loading capacity 2 3 million pixels Low latency is not supported Genlock BNC Qty 2 Support Genlock ...

Страница 14: ...rnet ports 1 8 and DVI2 corresponds to Ethernet ports 9 16 Front A Power button B USB interface for communication with a UDISK C LCD screen D Menu dial for interacting with the menu E Back button for exiting from the current operation or option in the menu Rear Inputs Outputs Description A Outputs RJ45 Qty 16 16 channel Gigabit Ethernet interface with each channel supporting up to 1G bandwidth Pro...

Страница 15: ...ixels Vertical resolution maximum 3840 pixels I OPT Output Fiber optic ports for connecting to the FE600 fiber optic extender J Power Power supply port AC 100 240V 50 60hz K Power switch HDMI 8 bit 10 bit and 12 bit support Color depth Input source 3840 x 2160 60Hz HDCP 3840 x 1080 60Hz HDCP 1920 x 1080 60Hz HDCP 8 bit RGB444 Yes Yes Yes YCbCr444 Yes Yes Yes YCbCr422 Yes Yes Yes YCbCr420 Yes Yes Y...

Страница 16: ...troller Front A Status display Rear Inputs Outputs Description A Outputs RJ45 Qty 16 16 channel Gigabit Ethernet interface with each channel supporting up to 1G bandwidth Total loading capacity 8 8 million pixels Low latency is not supported Product overview Velvet LED Display System Installation and Setup Guide CorePlus Series Remote Power 16 020 102423 01 Rev 1 06 2018 Copyright 2018 Christie Di...

Страница 17: ...backup channel of OPT1 OPT4 is the backup channel of OPT2 Either Gigabit Ethernet port or optical fiber port can be used at the same time but cannot be used to connect devices simultaneously E Power Power supply port AC 100 240V 50 60hz F Power switch G Power supply port AC 100 240V 50 60hz Product overview Velvet LED Display System Installation and Setup Guide CorePlus Series Remote Power 17 020 ...

Страница 18: ...n tiles on page 24 5 Reinstall the LED modules B on page 24 6 Install and configure the Remote Power Supply Rack Shelf on page 25 7 Connect the tile power cables to the Remote Power Supply Rack Shelf on page 25 8 Connect the data cables to the video sources on page 28 9 Power on the array on page 29 10 Install the controller software Install the E500 controller software on page 31 Install the E600...

Страница 19: ...at any time Before connecting the controller to the wall Christie recommends updating the firmware and configuring the controller Installing the mounting pads If the tiles are being installed onto a flat wall surface determine where the mounting pads should be installed and attach them to the support structure Warning If not avoided the following could result in death or serious injury External su...

Страница 20: ...ng template with the bottom left template hole centered on the point identified in step 2a c Level and hang the mounting template on the support structure 3 Insert the springs into the mounting pads 4 Install the mounting pads a Place the mounting pads inside the template holes and secure them to the support structure For installation onto a steel structure tighten the M6 screws to a torque of 3 5...

Страница 21: ...l display walls must have permanent external supports The amount of external support required depends on the size of the display wall A minimum of two people or appropriately rated lift equipment is required to safely lift install or move the product 1 If present remove the metal plates that cover all the external pass through holes in the tile chassis including the plate surrounding the power and...

Страница 22: ...ve the top and bottom row of LED modules from the tile and set them on a padded surface To ensure the LED modules are reinstalled on the same tile and in the same position on the carrier assembly label the chassis carrier assembly and LED modules 2 Ensure there are minimal gaps between the LED modules of each tile a To adjust the spacing between tiles in two columns change the tightness of the scr...

Страница 23: ...bles need to be connected to the first tile in an adjacent column follow these steps a Ensure the covers for the pass through holes on the sides of the tiles have been removed b Disconnect the short Ethernet cables from the data ports at the top of the hub board A c Connect 1 5m Ethernet cables to the main and redundant data ports at the top of the hub board d Feed the cables through the interior ...

Страница 24: ...ide of the tile beside the original power port location d Secure the port to the chassis e Connect the power cable to the first tile in the new column 6 After the data and power cables have been routed through the array reinstall the metal plates onto the cable pass through holes on the exterior sides of the array 7 Reinstall the rear covers on each tile 8 Connect the cabinet power cable to the Re...

Страница 25: ...lift the handle and snap it into place 4 Repeat steps 1 to 3 for each rectifier in the Remote Power Supply Rack Shelf Connecting the LED tile power cables to the Remote Power Supply Rack Shelf To power the Velvet CorePlus Remote Power LED Display System tiles connect the cables between the tiles and the Remote Power Supply Rack Shelf 1 Connect the main power cable to the Remote Power Supply Rack S...

Страница 26: ...n the MSXML add on 6 Log in to the Remote Power Supply Rack Shelf with your username and password The default username is Admin and the default password is 1234 Changing the IP address of the Remote Power Supply Rack Shelf In an environment where there are multiple Remote Power Supply Rack Shelf devices you must have a unique IP address for each device 1 Select Communications Configure Communicati...

Страница 27: ...in to the Remote Power Supply Rack Shelf web interface 2 Select Controller Temperature Units 3 Select whether the display units are Celsius or Fahrenheit 4 Click Save Resetting the breakers When too many panels are connected or too much power is sent through the Remote Power Supply Rack Shelf the breakers may interrupt the current flow Reset the breakers to resume operation If the breakers disconn...

Страница 28: ... on the array After the controller is connected and powered up the video content is available as long as the video source is connected Installing the FE600 fiber optic extender A fiber optic extender increases the available distance between the LED display and the E600 controller The FE600 fiber optic extender can only be used with the E600 controller The FE600 fiber extender increases the transmi...

Страница 29: ...e Power Supply Rack Shelf When a rectifier is on the OFF and ON buttons are flush with the front plate A When a rectifier is off the ON side of the switch extends beyond the front plate B As the wall is powering on light flickers on the tiles 3 Wait for 3 5 minutes after powering on the rectifiers 4 Turn on the controller a On the rear of the controller turn the power switch to On b On the front o...

Страница 30: ...it for 3 5 minutes after powering off the controller 3 Turn off each rectifier in the Remote Power Supply Rack Shelf Installation and setup Velvet LED Display System Installation and Setup Guide CorePlus Series Remote Power 30 020 102423 01 Rev 1 06 2018 Copyright 2018 Christie Digital Systems USA Inc All rights reserved ...

Страница 31: ...the controller software is on the same network at the controller 2 Connect a USB cable between the controller and the computer running the controller software 3 Launch the controller software and log in as the administrator a Click User Advanced User Login b Login with the password admin Setting the output mode Ensure the E500 controller is configured to use the correct output mode When the incorr...

Страница 32: ...3 To confirm the display is connected to and recognized by the controller in the Local System Info area ensure Control System has a value of 1 If the controller is not recognizing the tiles select System Reconnect 4 If the Monitor Information area reports that there is no screen verify that the output mode is set to Ports and in the E500 controller software select System Reconnect 5 Switch to the ...

Страница 33: ...il the controller screen flashes 2 To re enable access to the controller menu press and hold the menu dial and back button for approximately 15 seconds 3 Test if the controller is unlocked by using the menu dial to navigate the menu If the controller is still locked press and hold the menu dial and back button for a longer period of time Upgrading the firmware on the E500 controller When a new ver...

Страница 34: ...software both display a progress indicator After the upgrade is complete the controller reboots 9 To verify the upgrade was successful in the top left corner of the controller display verify the version number displayed is 1 0 5 9 Configuring the E500 controller Velvet LED Display System Installation and Setup Guide CorePlus Series Remote Power 34 020 102423 01 Rev 1 06 2018 Copyright 2018 Christi...

Страница 35: ...unning the controller software is on the same network at the controller 2 Connect a USB cable between the controller and the computer running the controller software 3 Launch the controller software and log in as the administrator a Click User Advanced User Login b Login with the password admin Adjusting the initial picture coordinates Adjust the initial coordinates of the pictures on the screen 1...

Страница 36: ...es to the selected color 6 Reset the Self Test to Normal and click Send 7 Click Close Reviewing the tile configuration Review the tile configuration reported in the E600 controller software 1 Connect a USB cable between the controller and the computer running the controller software 2 Launch the controller software and log in as the administrator a Click User Advanced User Login b Login with the p...

Страница 37: ...t of the controller 1 To disable access to the controller menu press and hold the menu dial and back button until the controller screen flashes 2 To re enable access to the controller menu press and hold the menu dial and back button for approximately 15 seconds 3 Test if the controller is unlocked by using the menu dial to navigate the menu If the controller is still locked press and hold the men...

Страница 38: ...confirmation message click Yes As the firmware upgrade is installed the controller screen and controller software both display a progress indicator After the upgrade is complete the controller reboots 9 To verify the upgrade was successful in the top left corner of the controller display verify the version number displayed is 1 0 5 9 Configuring the E600 controller Velvet LED Display System Instal...

Страница 39: ...damaging the LEDs clean the panel only if absolutely necessary 1 To clean the LED panels use a dry clean soft cloth with a low lint count or a paint brush to remove any particles 2 To remove loose particles between the LEDs use filtered compressed air Ensure the air compressor does not spray oil or condensation Do not use the following products when cleaning the panels Compressed air cans Liquids ...

Страница 40: ...ns FCC CFR47 Part 15 Subpart B Class A Unintentional Radiators CAN ICES 003 A NMB 003 A Information Technology Equipment Including Digital Apparatus Limits and Methods of Measurement CISPR 32 EN 55032 Class A IEC 61000 3 2 EN61000 3 2 Limits for Harmonic Current Emissions Immunity IEC 61000 3 3 EN61000 3 3 IEC EN61000 IEC 61000 4 2 EN61000 4 2 IEC 61000 4 3 EN61000 4 3 IEC 61000 4 4 EN61000 4 4 IE...

Страница 41: ...registration evaluation authorization and restriction of chemicals REACH and the applicable official amendment s EU Directive 2012 19 EU on waste and electrical and electronic equipment WEEE and the applicable official amendment s Regulatory Velvet LED Display System Installation and Setup Guide CorePlus Series Remote Power 41 020 102423 01 Rev 1 06 2018 Copyright 2018 Christie Digital Systems USA...

Страница 42: ...lic of South Africa ph 27 0 11 510 0094 Korea Seoul ph 82 2 702 1601 Japan Tokyo ph 81 3 3599 7481 India ph 91 080 6708 9999 Germany ph 49 2161 664540 France ph 33 0 1 41 21 44 04 Russian Federation and Eastern Europe ph 36 0 1 47 48 100 China Shanghai ph 86 21 6278 7708 China Beijing ph 86 10 6561 0240 Brazil ph 55 11 2548 4753 Australia ph 61 0 7 3624 4888 Worldwide offices Italy ph 39 0 2 9902 1...

Страница 43: ......

Отзывы: