![Christie LED012-CP-R Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/christie/led012-cp-r/led012-cp-r_installation-and-setup-manual_2603529027.webp)
Changing the time on the Remote Power Supply Rack Shelf
Configure the time on the Remote Power Supply Rack Shelf.
The date and time is a dynamic field, and as changes are made to the values on the screen the
internal values are also changed. An event is added to the event log detailing the changes made.
1. Log in to the Remote Power Supply Rack Shelf web interface.
2. Select Controller > Date and Time.
3. Set the date and time for the Remote Power Supply Rack Shelf.
•
Manually enter the date and time for the Remote Power Supply Rack Shelf to use.
•
Automatically retrieve the date and time from a server.
a. Select Enable SNTP Service.
b. Type the IP address of the SNTP source.
c. In the Time Zone Adjustment field, select the time zone adjustment for the location
of the Remote Power Supply Rack Shelf.
4. Click Save.
5. If the time is set by an SNTP service, click Get Time Now.
Setting the temperature units
Change the units used when reporting the temperature.
1. Log in to the Remote Power Supply Rack Shelf web interface.
2. Select Controller > Temperature Units.
3. Select whether the display units are Celsius or Fahrenheit.
4. Click Save.
Resetting the breakers
When too many panels are connected or too much power is sent through the Remote Power Supply
Rack Shelf, the breakers may interrupt the current flow. Reset the breakers to resume operation.
If the breakers disconnect the current, the On button is released for the affected Output.
1. Reduce the number of panels connected to the input or the amount of power going through the
input.
2. Push the On button back into place.
The current is reconnected and the output is powered.
Connecting the LED tile power cables to the
Remote Power Supply Rack Shelf
To power the Velvet CorePlus (Remote Power) LED Display System tiles, connect the cables between
the tiles and the Remote Power Supply Rack Shelf.
1. Connect the main power cable to the Remote Power Supply Rack Shelf.
Installation and setup
Velvet LED Display System Installation and Setup Guide–CorePlus Series (Remote Power)
27
020-102423-01 Rev. 1 (06-2018)
Copyright
©
2018 Christie Digital Systems USA, Inc. All rights reserved.