•
5/16-18 wood screws—Tighten to a torque of 10.5 Nm (93 lbs.in)
b) Install any exterior edge or corner mounting pads in the proper location inside the
template holes, pushing the pads as close to the edge of the template holes as possible.
For example, install the mounting pads for the top left corner tile in the bottom right
corner of the template hole.
The corners and sides of the tiles should line up with the center of the mounting pads.
c) Slide the spring into the M6 bolt holes.
5. Remove the template from the mounting pads.
6. To install the remaining mounting pads for the array, place the template over already installed
mounting pads so three of the template holes have mounting pads, and the remaining holes
are empty. Repeat steps 2 to 4 for all other rows in the array.
Mounting the tiles
Install the tiles in the array row by row. Do not attempt to construct the array column by column.
Warning! If not avoided, the following could result in death or serious injury.
•
External support for a display wall must be designed and implemented by a Christie qualified
installer and must comply with local area regulations and safety standards.
•
All display walls must have permanent external supports. The amount of external support
required depends on the size of the display wall.
•
A minimum of two people or appropriately rated lift equipment is required to safely lift, install,
or move the product.
1. If present, remove the metal plates that cover all the external pass-through holes in the tile
chassis, including the plate surrounding the power and data ports.
2. Place the tile face down on a protected surface and remove the rear cover.
3. Using the LED module removal tool, remove the top and bottom row of LED modules from the
tile and set them on a padded surface.
To ensure the LED modules are reinstalled on the same tile and in the same position on the
carrier assembly, label the chassis, carrier assembly, and LED modules.
4. Ensure all adjustment screws are flush with the outside of the tile chassis.
5. Attach the first tile in the center of the bottom row to the mounting pads in the four mounting
points.
Ensure the M6 bolts have at least three full thread engaged into the tile and are torqued to
3.55 Nm (31.42 lb.in).
6. To install the second tile in the row, repeat steps 1 to 5.
Installation and setup
Velvet LED Display System Installation and Setup Guide–CorePlus Series (Remote Power)
21
020-102423-01 Rev. 1 (06-2018)
Copyright
©
2018 Christie Digital Systems USA, Inc. All rights reserved.