Service setups
HS Series D13 Service Manual
34
020-000892-03 Rev. 1 (12-2019)
Running a remote port performance test
To perform the remote port performance test, complete the following steps.
1. Connect the projector and remote controller using an audio cable.
2. On the IR remote, press
Menu
.
The image of on-screen display menu is projected.
Running a USB A port performance test
To perform the USB A port performance test, complete the following steps.
1. Connect a U disk to the projector over the USB A port.
2. Switch the signal source to
Card reader
.
The data of U disk is projected.
ID
Part name
Description
1
Test equipment
Remote controller
2
Test signal
None
3
Inspection item
Wired remote port performance test
4
Inspection distance
1.8 to 2.2 m
5
Criteria
To confirm that it can power on/off the projector, on the remote controller,
press
ON
.
ID
Part name
Description
1
Test equipment
U disk
2
Test signal
64 Gray RGBW
3
Inspection item
USB A port performance test
4
Inspection distance
1.8 to 2.2 m
5
Criteria
No abnormal color performance, line distortion, or noise exist on the screen
Содержание D13HD-HS
Страница 1: ...HS Series D13WU HS D13HD HS Service Manual 020 000892 03...
Страница 112: ......