Parts and Module Replacement
CP42LH Service Manual
44
020-101686-03 Rev. 1 (08-2016)
LVPS/liquid cooling cover
Estimated replacement time: 1 minute
Remove the LVPS/liquid cooling cover to gain access to
the liquid cooling assembly filter.
1. Loosen the 3 captive screws on the top of the
cover.
2. Lift up the cover up and away from the
projector.
Rear cover
Estimated replacement time: 12 minutes
2. Remove the
3. Remove
4. Remove
5. Disconnect the P1, P8, J2, J4, and J5 connectors from the
interlock card.
6. Loosen the 3 screws securing the rear cover.
7. Disconnect the touch panel controller (TPC) cable.
8. Tilt and lift the back cover away from the projector.