3. Record the measurements in the System and Design Installation Verification Checklist (P/
N:020-103558-XX).
If additional space is required to record the fixture measurements, add additional forms.
4. Provide a copy of the System and Design Installation Verification Checklist (P/N:020-103558-
XX) to the client and retain a copy for your records.
Installation and setup
CounterAct Installation and Setup Guide
44
020-103456-02 Rev. 1 (12-2021)
Copyright
©
2021 Christie Digital Systems USA, Inc. All rights reserved.
Содержание CA20-AC
Страница 1: ...Installation and Setup Guide 020 103456 02 CounterAct ...
Страница 52: ......