7. Remove the receiver box from the rotation plate without removing the screws by rotating the
plate and sliding the heads of the screws through the larger holes at the end of the track.
8. Install the mounting block adapter (B in the image below) using four M3 screws and two Erico
commercial hangers (A in the image below) with primary height and position based on your
field measurement.
ID
Description
Quantity
A
Erico hanger
2
B
Mounting block adapter
1
C
M3 screws
4
9. Connect the load wires from the assembly adapter and the two Erico hangers to the rigid roof
construction ensuring the load wires are not taut.
10. Insert the four clips of the hanger onto the beam.
11. Loosen the three M3 screws (A) and adjust the rotational orientation, if necessary.
The default Y axis of product orients along the main beam of grid when the two Δ marks are
aligned. Ensure you tighten the three screws when done.
ID
Description
Quantity
A
M3 screws
3
B
Default align mark
1
12. Connect the safety cables between the receiver box and the bracket as required.
Installation and setup
CounterAct Installation and Setup Guide
33
020-103456-02 Rev. 1 (12-2021)
Copyright
©
2021 Christie Digital Systems USA, Inc. All rights reserved.
Содержание CA20-AC
Страница 1: ...Installation and Setup Guide 020 103456 02 CounterAct ...
Страница 52: ......