–19 –
Step 1. Loosen the grub screws with the supplied
screwdriver (1.5 mm blade width).
Step 2. Slide the filament guide
down the Roller shafts in the
direction of the arrow.
To remove the used rollers
To mount new rollers
Step 1
Loosen the rollers with the supplied
open end wrench (4 mm jaw width).
NOTE:
Should any of the three threaded
studs be damaged, replace it by
one of the threaded studs supplied
with the new rollers.
Step 2
Screw off the rollers
NOTE:
When loosening the rollers,
steady the roller bolts with the
supplied screwdriver to prevent
loosening of the roller shafts.
Step 3
Screw the new rollers to the roller shafts.
Содержание ETB
Страница 1: ...MODEL ETB ETPB TENSION METERS Operating Manual ...
Страница 6: ... 5 2 4 Display elements Numeric Display Display with Bar Graph ...
Страница 25: ... 24 NOTES ...
Страница 26: ......