See Figure 3: Connections of the measurements of the complete site with single-phase output
The measurements described in the previous chapters can be made simultaneously.
1.
Connect the VDC MEASURE LINE1 voltage inputs to the DC voltage output of the photovoltaic
panel using the cables provided, respecting the polarity;
2.
Connect the DC current clamp to the IDC MEASURE PROBE1 input and to the positive or
negative cable of the DC output of the photovoltaic panel. Note that the clamp is sensitive to the
direction of the current measured;
3.
Activate the DC clamp;
4.
Connect the pyranometer to the PYRANOMETER input. The pyranometer measures the
insolation;
5.
Connect the ambient temperature probe to the AMBIENT TEMPERATURE input. Place the
probe near the photovoltaic panel;
6.
Connect the contact probe to the PANEL TEMPERATURE input. Place the probe in thermal
contact with the photovoltaic panel;
7.
Connect the VAC MEASURE LINE1 voltage inputs to the AC voltage output of the inverter using
the cables provided;
8.
Connect the AC current clamp to the IAC MEASURE PROBE1 input and to the alternating
current output cable of the inverter.
8.12 MEASUREMENT ACQUISITION
Refer to the MEASUREMENT MENU: MEASUREMENT ACQUISITION
Содержание Green TEST-FTV 100
Страница 1: ... Testing instrument for photovoltaic installations ENGLISH User s manual ...
Страница 14: ...GREEN TEST FTV 100 English Page 14 sur 47 ...
Страница 15: ...GREEN TEST FTV 100 English Page 15 sur 47 ...
Страница 35: ...GREEN TEST FTV 100 English Page 35 sur 47 Example of a Report of on site measurement on the tests performed ...